Summary:

ORDINANCE appropriating $1,167,000.00 out of Metro Projects Construction DDSRF and approving and authorizing Professional Engineering Services Contract between the City of Houston and HUITT-ZOLLARS, INC for South Lockwood Paving and Drainage: Crites Street to Harrisburg; providing funding for CIP Cost Recovery relating to construction of facilities financed by the Metro Projects Construction DDSRF - DISTRICT H - CISNEROS

Background:

SUBJECT:  Professional Engineering Services Contract between the City and Huitt-Zollars, Inc. for South Lockwood Paving and Drainage:  Crites Street to Harrisburg, WBS No. N-100027-0001-3.

 

PROJECT NOTICE/JUSTIFICATION:  This project is part of the Street and Traffic Capital Improvement Plan (CIP) and is necessary to meet City of Houston Standards as well as improve traffic circulation, mobility, and drainage in the service area.  Deterioration of existing pavement and future traffic volume requires that the roadway be reconstructed.

 

DESCRIPTION/SCOPE:  This project consists of the design of approximately 8,800 linear feet, of a four-lane divided concrete roadway with storm drainage, curbs, sidewalks, driveways, street lighting, traffic control, and necessary underground utilities.

 

LOCATION:  The project area is generally bound by Buffalo Bayou on the north, IH-45 on the south, Wayside on the east and Scott Street on the west.  The project is located in Key Map Grids 494 P & T.

 

SCOPE OF CONTRACT AND FEE:  Under the scope of the Contract, the Consultant will perform Phase I - Preliminary Design, Phase II - Final Design, Phase III -Construction Phase Services and Additional Services.  The Basic Services fee for Phase I is based on cost of time and materials with not-to-exceed agreed upon amount.  The Basic Services fees for Phase II and Phase III are based on a negotiated lump sum amount.  The total Basic Services appropriation is $560,870.00. 

 

The Contract also includes certain Additional Services to be paid either as lump sum or on a reimbursable basis.  The Additional Services include Surveying, Technical Review committee Presentation, Geotechnical Investigation, Environmental Site Assessment, Public Meetings, Tree Protection/Mitigation Plans, Traffic Control Plans, Storm water Pollution Plan, Independent Quantity Take-Off, Drainage Impact Study, and Inspection of Existing Sewer Lines, and Reproduction.  The total Additional Services appropriation is $445,478.00.

 

The negotiated maximum for Phase I Services is $264,310.00.

 

The total cost of this project is $1,167,000.00 to be appropriated as follows:  $1,006,348.00 for Contract services and $160,652.00 for CIP Cost Recovery.

 

PAY OR PLAY PROGRAM:  The proposed contract requires compliance with the City’s ‘Pay or Play’ ordinance regarding health benefits for employees of City contractors. In this case, the Consultant provides health benefits to eligible employees in compliance with City policy.

 

M/WBE PARTICIPATION:  The M/WBE goal for the project is set at 24%. The Consultant has proposed the following firms to achieve this goal.

 

 

Name of Firms

Work Description

Amount

% of Total Contract

1.

Accessibility Check

ADA Compliance Services

$3,000.00

0.30%

2.

Asakura Robinson,

CompanyLLC

Tree Protection/Mitigation

$16,000.00

1.59%

3.

Aviles Engineering Corporation

Geotechnical Engineering

$22,961.00

2.28%

4.

B&E Reprographics, Inc.

Reprographic Services

$6,000.00

0.60%

5.

Chief Solutions, Inc. Pipeline Video Televising $7,500.00

Pipeline Video Televising

$8,000.00

0.79%

6.

Crouch Environmental

Services, Inc.

Environmental Services

$19,400.00

1.93%

7.

Gunda Corporation, LLC

Traffic Engineering

$135,700.00

13.48%

8.

Midtown Engineers, LLC

Civil Engineering

$59,105.00

5.87%

9.

Watearth, Inc.

Storm Water pollution Prevention

$11,942.85

1.19%

 

 

TOTAL

$282,108.85

28.03%

 

ESTIMATED FISCAL OPERATING IMPACT

 

Project WBS No.

FY17

FY18

FY19

FY20

FY21

FY17-FY21 Total

N-100027-0001-3

$0

$0

$0

$0

$0

$0

 

No significant Fiscal Operating impact is anticipated as a result of this project. 

 

 

_________________________________

Dale A. Rudick, P.E., Director

Department of Public Works and Engineering

Amount of Funding:
Total of $1,167,000.00 from Fund 4040 – METRO Projects Construction DDSRF.   
Contact Information:

Ravi Kaleyatodi, P.E., CPM

Phone: (832) 395-2326

Senior Assistant Director