Item Coversheet

CITY OF HOUSTON - CITY COUNCIL

Meeting Date: 10/14/2025
District E
Item Creation Date: 9/26/2025

HAS – Amendment No. 1 and Maximum Contract Amount Increase for the Reimbursable Agreement with FAA for Limited Technical and Engineering Support for the Construction of Taxiway L Project at EFD; Project No. 707

Agenda Item#: 33.


 
                               
Summary:

ORDINANCE approving and authorizing a first amendment to a Reimbursable Agreement between the City of Houston and the FEDERAL AVIATION ADMINISTRATION for Limited Technical and/or Engineering Support, Design, and Construction Services at Ellington Airport (EFD); amending Ordinance No. 2024-0187 to increase the maximum contract amount - $202,525.45 - Enterprise Fund - DISTRICT E - FLICKINGER

Background:

RECOMMENDATION:

Adopt an ordinance approving and authorizing Amendment No. 1 to the Reimbursable Agreement between the City of Houston and the Federal Aviation Administration (FAA) to perform Limited Technical and/or Engineering Support, Design, and Construction Services at Ellington Airport (EFD) in support of the Construction of Taxiway L Project (Project No. 707) and increasing the maximum contract amount from $113,101.00 to $315,626.45.

 

SPECIFIC EXPLANATION:

On March 6, 2024, City Council adopted Ordinance 2024-0112, approving and authorizing a Design-Build Contract for the Taxiway L and Runway 4/22 Shoulders Phase 1 Construction at Ellington Airport (EFD). The project entails the construction of Taxiway L on the south side of Runway 4/22 at EFD to provide a full-length, parallel taxiway meeting Federal Aviation Administration (FAA) standards. The project includes design and construction of Taxiway L and associated taxiway connectors as well as shoulders for new edge lights, relocation of wind cones, marking/signage/lighting, and drainage improvements. This project is included in the HAS Capital Improvement Plan (CIP), and the new infrastructure will provide airfield access to the current and future Houston Spaceport tenants at EFD. However, FAA Navigational Aids will be impacted, requiring technical and engineering support from the FAA and a corresponding Reimbursable Agreement for those services.

 

On April 4, 2024, City Council adopted Ordinance 2024-187, approving and authorizing a Reimbursable Agreement and setting a maximum contract amount of $113,101.00 for the FAA to perform Limited Technical and/or Engineering, Support, Design and Construction Services for the Taxiway L and Runway 4-22 Shoulders Phase 1 Construction at Ellington Airport (EFD).

 

It is now requested that City Council adopt an ordinance approving and authorizing Amendment No. 1 to the Reimbursable Agreement and increasing the maximum contract amount by $202,525.45. The additional funding will allow the FAA to perform the construction services supervision of the design as reviewed and approved under the initial Reimbursable Agreement.

 

Project Costs:

The additional estimated FAA costs associated with this modified Agreement are as follows:

 

 

 

Fiscal Note:

Funding for this item is included in the FY2026 Adopted Budget. Therefore, no Fiscal Note is required as stated in the Financial Policies.

 

Director’s Signature:

 

 

__________________

Jim Szczesniak

Houston Airport System

 

Estimated Spending Authority

DEPARTMENT

FY2026

OUT YEARS

TOTAL

Houston Airport System

$202,525.45

$0.00

$202,525.45


Prior Council Action:

04/04/24 (O) 2024-187

Amount and Source of Funding:

$202,525.45

HAS Revenue Fund

Fund 8001

Contact Information:

Todd Curry        281/233-1896

Scott Hill            281/233-1639

ATTACHMENTS:
DescriptionType
Signed CoversheetSigned Cover sheet