Item Coversheet

CITY OF HOUSTON - CITY COUNCIL

Meeting Date: 3/25/2025
District B
Item Creation Date: 3/6/2025

HAS – Reimbursable Agreement with FAA for Limited Technical and Engineering Support, Design, and Construction/Installation Activities for the Completion of Duct Bank in Vicinity of Ditch G and Runway 26L at IAH

Agenda Item#: 22.


 
                               
Summary:

ORDINANCE approving and authorizing Reimbursable Agreement between the City of Houston and the Federal Aviation Administration for Engineering, Design, and Construction Services at George Bush Intercontinental Airport/Houston (IAH); providing a maximum contract amount - $253,998.81 - Enterprise Fund - DISTRICT B - JACKSON

Background:

RECOMMENDATION:

Adopt an ordinance approving and authorizing a Reimbursable Agreement between the City of Houston and the Federal Aviation Administration (FAA) for the FAA to perform Limited Technical and/or Engineering Support, Design, and Construction/Installation Activities in support of the Completion of Duct Bank in Vicinity of Ditch G and Runway 26L Impacting Fiber Optic Transmission System (FOTS) at George Bush Intercontinental Airport/Houston (IAH) and setting a maximum contract amount of $253,998.81.

 

SPECIFIC EXPLANATION:

This Reimbursable Agreement provides funding for the Federal Aviation Administration (FAA) to perform limited technical and/or engineering support, design, and construction/installation activities in support of the Rehabilitation of Taxiway SA & SB at IAH (Project No. 646A). Project No. 646A includes the relocation of the FAA duct bank which is currently exposed in the vicinity of Drainage Ditch G1. The duct bank will be relocated, and the exposed section will be re-routed under the ditch.    

 

Support services from the FAA are necessary to support the completion of the duct bank to encase exposed fiber in the vicinity of Ditch G and Runway 26L Approach Lighting System with Sequenced Flashing Lights (ALSF) Shelter and Localizer (LOC) impacting FAA National Airspace System facilities including Fiber Optic Transmission System (FOTS), FAA cabling, and infrastructure. This Reimbursable Agreement provides funding for the FAA to establish these services to meet all applicable FAA standards and to ensure that all impacted systems are working correctly.

 

The work to be performed through the execution of this Reimbursable Agreement will include the following: technical consultation, site visits, feasibility assessments, project planning, scope definition, development of cost estimate(s), review of sponsor-provided design packages, development of FAA design packages, construction/installation oversight, modification, removal, and restoration required to address impacted FAA National Airspace System facilities.

 

Project Costs:

The estimated FAA costs associated with this Agreement are as follows:

 

 

Fiscal Note:

Funding for this item is included in the FY2025 Adopted Budget; therefore, no Fiscal Note is required as stated in the Financial Policies.

 

Estimated Spending Authority

Departments

FY2025

Out Years

Total

Houston Airport System

$253,998.81

$0.00

$253,998.81

 

 

Director’s Signature:

 

____________________

Jim Szczesniak

Houston Airport System

Amount and Source of Funding:

$253,998.81

HAS Revenue Fund

Fund 8001

Contact Information:

Todd Curry               281/233-1896

Scott Hill                  281/233-1639

ATTACHMENTS:
DescriptionType
Signed CoversheetSigned Cover sheet