Item Coversheet

CITY OF HOUSTON - CITY COUNCIL

Meeting Date: 3/25/2025
District H
Item Creation Date: 12/6/2024

HPW – 20FAC2536 PES / Civitas Engineering Group, Inc.

Agenda Item#: 39.


 
                               
Summary:

ORDINANCE appropriating $2,523,688.00 out of Water & Sewer System Consolidated Construction Fund; approving and authorizing Professional Engineering Services Contract between the City of Houston and CIVITAS ENGINEERING GROUP, INC for Capacity Remedial Measures Plan (CRMP) Package 9 - Areas 8 and 11 - Basin IB032 and IB022; providing funding for CIP Cost Recovery financed by the Water & Sewer System Consolidated Construction Fund - DISTRICT H - CASTILLO

Background:

SUBJECT: Professional Engineering Services Contract between the City and Civitas Engineering Group, Inc. for Capacity Remedial Measures Plan (CRMP) Package 9 - Areas 8 and 11 - Basins IB032 and IB022.

 

RECOMMENDATION:  An ordinance approving a Professional Engineering Services Contract with Civitas Engineering Group, Inc. for Capacity Remedial Measures Plan (CRMP) Package 9 - Areas 8 and 11 - Basins IB032 and IB022 and appropriate funds.

 

PROJECT NOTICE/JUSTIFICATION: This project is part of the Capital Improvement Plan and is required to develop and provide mitigation recommendations for the (CRMP).

 

The work to be performed under this contract award is necessary to maintain compliance with Houston's wastewater consent decree with the EPA and TCEQ.

 

DESCRIPTION/SCOPE: This project consists of improvements to the Wastewater Collection and Transmission System with known capacity restraints to target the reduction of sanitary sewer overflows.

 

LOCATION:   Street list is provided. 

 

SCOPE OF CONTRACT AND FEE: Under the scope of the Contract, the Consultant will perform Phase I - Preliminary Design, Phase II – Final Design, Phase III - Construction Phase Services and Additional Services. Basic Services Fee for Phase I is based on cost of time and materials with a not-to-exceed agreed upon amount. The Basic Services fees for Phase II and Phase III are based on a negotiated lump sum amount. The total Basic Services appropriation is $1,449,265.10.

 

The Contract also includes certain Additional Services to be paid either as a lump sum or on a reimbursable basis. The total Additional Services appropriation is $954,246.86.

 

The negotiated maximum for Phase I Services is $142,440.0.

 

The total cost of this project is $2,523,688.00 to be appropriated as follows: $2,403,511.96 for Contract services and $120,176.04 for CIP Cost Recovery.

 

PAY OR PLAY PROGRAM: The proposed contract requires compliance with the City’s ‘Pay or Play’ ordinance regarding health benefits for employees of City contractors. In this case, the Consultant provides health benefits to eligible employees in compliance with City policy.

 

M/WBE PARTICIPATION: The standard M/WBE goal set for the project is 26.00%. The Consultant has proposed a 27.52% MWBE plan to meet the goal.

 

 

 

Name of Firms

Work Description

Amount

% of Total Contract

1.

RODS Subsurface Utility Engineering, Inc.

Engineering Services

$  14,768.00

0.61%

 

 

 

 

 

2.

Ally General Solutions, LLC

Traffic Engineering Consulting Services, All Other Support Services

$  78,302.00

3.26%

3.

RODS Surveying, Inc.

Land Surveying Services

$258,272.00

10.75%

 

 

 

 

 

4.

Associated Testing Laboratories, Inc.

  Engineering Services, Testing Laboratories 

$292,212.00

12.16%

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5.

Aurora Technical Services LLC

Engineering Services, Construction Management, Commercial and Institutional Building

$  17,820.00

0.74%

 

 

 

 

 

 

 

TOTAL

$661,374.00

27.52%

 

FISCAL NOTE: No significant Fiscal Operating impact is anticipated as a result of this project.

 

 

 

____________________________

Randall V. Macchi Director

Houston Public Works

 

WBS No. R-001000-0034-3

Amount and Source of Funding:

$2,523,688.00

Water and Sewer System Consolidated Construction Fund

Fund No. 8500

Contact Information:

Name

Service Line

Contact No.

Roberto Medina, Assistant Director

DO-HPW Council Liaison Office

832.395.2456

Maria Perez, HPW Agenda Coordinator

DO-HPW Council Liaison Office

832.395.2282

Markos E. Mengesha, Assistant Director

FAC-HPW Capital Projects

832.395.2356


ATTACHMENTS:
DescriptionType
Signed CoversheetSigned Cover sheet
Maps Backup Material