25CONS593– Appropriate Funds – Elevator Repair Service, Inc.- 8000 N. Stadium Drive Houston Health Department Elevator Upgrades

Agenda Item#: 24.


 
                               
Summary:
ORDINANCE appropriating $1,326,307.40 out of Public Health Consolidated Construction Fund to existing contract with ELEVATOR REPAIR SERVICE, INC, for Modernization of Five Elevators at the Houston Health Department, 8000 N. Stadium Drive - DISTRICT K - CASTEX-TATUM 
Background:

RECOMMENDATION:  Appropriate funds for the project.

 

SPECIFIC EXPLANATION:  The General Services Department (GSD) recommends that City Council appropriate $1,326,307.40 to the existing city-wide contract with Elevator Repair Service, Inc. (ERS) for the modernization of all five (5) elevators at the Houston Health Department (HHD) office at 8000 N. Stadium Drive.

 

PROJECT LOCATION:  8000 N. Stadium Drive, Houston, TX 77054

 

PROJECT DESCRIPTION:  The project will include the modernization of three (3) traction elevators in the main building and two (2) hydraulic elevators in the parking garage. VDA Elevator & Escalator Consulting Firm, has determined the elevators have reached the end of their useful life and due to age, replacement parts are no longer available.  

 

The scope of work for this project includes labor and materials to cover the following: install elevator control systems, pumping units and electrical piping and wiring; replace door closers, rollers, spirators, gibs and interlocks; replace interior cab finishes; emergency phone, and cab door operator and equipment; car top operating station; replace pit safety switches, flood sensors; refurbish the pit buffers; install sump pumps with a fully automatic discharge system; replace elevator lobby buttons; firefighters service switch, and code required signage.

 

PREVIOUS HISTORY:  On January 15, 2020, by Ordinance 2020-53, the City Council awarded a three-year contract with two one-year options to ERS for elevator and escalator maintenance and repair services for various City of Houston facilities. 

 

M/WBE PARTICIPATION: M/WBE zero-percentage goal document approved by the Office of Business Opportunity.

 

FUNDING SUMMARY:

$ 1,205,734.00        Modernization Cost

$    120,573.40        10% Contingency Cost

$ 1,326,307.40        Total Funding

 

 

FISCAL NOTE:  No significant Fiscal Operating impact is anticipated as a result of this project.

 

WBS No.: H-000436

 

 

DIRECTOR’S SIGNATURE/DATE:

 

 

 

___________________________

C. J. Messiah, Jr.

General Services Department

 

 

_____________________________

Stephen L. Williams, M. Ed., MPA

Houston Health Department

 

 

Prior Council Action:

Ordinance 2020-53; Dated January 15, 2020

Amount and Source of Funding:

$1,326,307.40 -   Public Health Consolidated Construction Fund (4508)

 

Previous Funding:

$3,500,400.00 – Maintenance Renewal and Replacement Fund (2105)

$3,386,381.70 – Water and Sewer System Operating Fund (8300)

$   499,980.55 – General Fund (1000)

$7,386,762.25

 

 

Contact Information:

Enid M. Howard.

Council Liaison                  

Phone:  832-393-8023

ATTACHMENTS:
DescriptionType
Signed CoversheetSigned Cover sheet