HPW – 20INF2430-B Change Order / Total Contracting Limited

Agenda Item#: 4.


 
                               
Summary:

RECOMMENDATION from Director Houston Public Works for approval of Change Order No. 11, awarded to TOTAL CONTRACTING LIMITED for NSR 454 Subproject 1 - DISTRICT G - HUFFMAN

This item should only be considered after passage of Item 3 above

Background:

SUBJECT: Pass a motion approving Change Order No. 11 for NSR 454 Subproject 1.

 

RECOMMENDATION: (SUMMARY) Pass a motion approving Change Order No. 11.  

 

PROJECT NOTICE/JUSTIFICATION: This project will replace existing residential streets that have been deteriorating beyond economical repair and normal maintenance and improve drainage.

 

LOCATION:  The project area is generally bound by Woodway on the north, San Felipe Street on the south, South Post Lane on the east, and Chimney Rock on the west. 

CHANGE ORDER No. 11:   This work is required for the additional work described in Change Order No. 11: additional traffic signs, cost for expansion joints and dowels, additional waterlines, additional time for equipment rental, concrete driveways including excavation, conduit 4-inch PVC, and precast concrete manholes. The requirement of the work was discovered during the performance of the contract work.  This scope of work is necessary to complete the execution of this project due to the inspection results per the contract documents.  The contract duration for this project was 780 calendar days.  The project was awarded to Total Contracting Limited with an original Contract Amount of $15,995,665.98.

The proposed Change Order No. 11 is in the amount of $661,451.68 or 4.14% above the original contract amount and extends the contract time by 83 days. This will increase the original contract amount to $16,657,117.66.

 

M/WBE PARTICIPATION: The M/WBE goal established for this contract is 18.00%. The original Contract approved by Ordinance No. 2017-0859 is in the amount of $15,995,665.98.  Assuming approval of Change Order No. 11, the Contract amount will increase to $16,657,117.65. According to the Office of Business Opportunity, the Contractor’s to date MWBE/SBE performance is 23.28%.

 

 

 

__________________________________

Randall V. Macchi, Director

Houston Public Works

           

WBS No. N-000386-0001-4, S-000500-0223-4

Prior Council Action:

Ordinance No. 2017-0859, dated 11-01-2017

Amount and Source of Funding:

No additional funding required.

 

Original (previous) appropriation of $18,995,000.00

$13,869,000.00 from Fund No. 4042 – Street & Traffic Control and Storm Drainage (DDSRF).

($13,869,000.00 supported by Drainage Fees)

$  5,086,000.00 from Fund No. 8500 – Water and Sewer System Consolidated Construction.

 

Subsequent additional appropriation total of $694,524.26

$361,813.09 from Fund No. 4042 – Dedicated Drainage and Street Renewal Capital Fund – Drainage Charge.

$332,711.17 from Fund No. 8500 – Water and Sewer System Consolidated Construction.

 

 

 

 

 

 

 

 

 

Contact Information:

Name

Service Line

Contact Number

Roberto Medina, Interim Chief of Staff

 

Director`s Office - HPW Government Relations

 

(832) 395-2456

 

Maria Perez, HPW Agenda Director

Director`s Office - HPW Government Relations

 

(832) 395-2282

Tanu Hiremath, P.E., CFM, ENV SP Assistant Director

Capital Projects

(832) 395-2291


ATTACHMENTS:
DescriptionType
Signed CoversheetSigned Cover sheet