CITY OF HOUSTON - CITY COUNCIL

Meeting Date: 10/4/2022
District E
Item Creation Date: 7/25/2022

HPW – 20SD175 Addtn’l Approp / Kalluri Group, Inc.

Agenda Item#: 46.


 
                               
Summary:

ORDINANCE appropriating $743,400.00 out of Water & Sewer System Consolidated Construction Fund as an additional appropriation to Professional Engineering Services Contract between City of Houston and KALLURI GROUP, INC for East Water Purification Plant – Chlorine System Improvements (as approved by Ordinance No. 2016-0246); providing funding for CIP Cost Recovery relating to construction of facilities financed by the Water & Sewer System Consolidated Construction Fund - DISTRICT E - MARTIN

Background:

SUBJECT: Additional Appropriation to the Professional Engineering Services Contract between the City and Kalluri Group, Inc. for Engineering Services associated with the Chlorine System Improvements at East Water Purification Plant.

 

RECOMMENDATION: Approve an ordinance appropriating additional funds to the Professional Engineering Services Contract with Kalluri Group, Inc.

 

PROJECT NOTICE/JUSTIFICATION: This project is part of the City’s Capital Improvement Program.  This project is required to improve safety, operability, maintainability, and reliability of the East Water Purification Plant (EWPP) to comply with the Texas Commission on Environmental Quality and Surface Water Treatment Rule mandated by the United States Environmental Protection Agency and to meet existing and future water demand requirements.

 

DESCRIPTION/SCOPE: This project consists of providing professional engineering and related services associated with the design improvements of chlorine scrubber systems; integration of the scrubber control and monitoring functions into the Supervisory Control and Data Acquisition Network; replacement of existing chlorine feed piping, actuators, control valves (at 1-ton buildings, evaporator rooms at Plants 1 and 3); and the replacement of chlorine vapor detection system.

 

LOCATION: The project area is located at 12555 Clinton Drive and 2300 Federal Road. 

 

PREVIOUS HISTORY AND SCOPE: City Council approved the original contract on March 30, 2016, under Ordinance No. 2016-0246. The scope of services under the original contract consisted of Phase I – Preliminary Engineering, Phase II – Final Design and Phase III – Construction Phase Services, and Additional Services. Under this contract, the Consultant accomplished 70% replacement of the Chlorine dry scrubber with a more efficient wet Scrubber system at EWPP and completion of a study for the chemical feed system.  Additional council action included:  

 

Ord. No.

Ord. Date

Type

Scope

Accomplished to Date

2020-0497

June 10, 2020

Add. 

Phase I, II and III. Additional Services (surveying, geotechnical, temporary chemical feed system design).

Design of Chlorine System Improvements and Temporary Chemical Feed Study -completed.

 

SCOPE OF THIS ADDITIONAL APPROPRIATION AND FEE: Under the scope of the additional appropriation, the Consultant will accomplish the following: Life Safety System Improvements of Chlorine and Ton Container Buildings at Plants 1, 2 and 3 to improve safety.  Additional Chlorine Ton Container Storage to Enhance Emergency Preparedness. A fee of $518,000.00 is budgeted for Basic Services and $190,000.00 for Additional Services.

 

The total requested appropriation is $743,400.00 to be appropriated as follows: $708,000.00 for contract services and $35,400.00 for CIP Cost Recovery.

 

PAY OR PLAY PROGRAM: The proposed contract requires compliance with the City’s ‘Pay or Play’ ordinance regarding health benefits for employees of City Contractors. In this case, the Contractor provides health benefits to eligible employees in compliance with City policy. 

 

M/WBE PARTICIPATION: The M/WBE goal established for this project is 24%. The original contract amount and subsequent appropriation totals $2,867,507.37. The Contractor has been paid $2,438,827.00 (85.05%). Of this amount, $519,845.00 (21.32%) has been paid to M/WBE sub-contractors to date. Assuming approval of the requested additional appropriation, the contract amount will increase to $3,575,507.37.  The Contractor proposes the following plan to meet the M/WBE goal.

 

 

 

 

 

 

 

Name of Firms

Work Description

Amount

% of Total Contract

Paid Prior M/WBE Commitment

 

$519,845.00

14.54%

Unpaid Prior M/WBE Commitment

 

$270,153.00

7.56%

Azcarate & Associates Consulting Engineers, LLC DBA AACE

Mechanical, Engineering Services

 $175,000.00

 4.89%

 

TOTAL

$964,998.00

26.99%

 

FISCAL NOTE: No significant Fiscal Operating impact is anticipated as a result of this project.

 

 

 

 

_________________________________

Carol Ellinger Haddock, P.E., Director

Houston Public Works

 

WBS No(s). S-000056-0080-3, S-000056-080D-3


Prior Council Action:

Ordinance No. 2016-0246, dated 03-30-2016

Ordinance No. 2020-0497, dated 06-10-2020

Amount and Source of Funding:

$743,400.00 - Fund No. 8500 - Water and Sewer System Consolidated Construction Fund

 

Original appropriation of $1,781,000.00 from Fund No. 8500 - Water and Sewer System Consolidated Construction

Subsequent appropriation of $1,450,798.10 from Fund No. 8500 – Water and Sewer System Consolidated Construction

Contact Information:

Markos E. Mengesha P.E, CCM.

Interim Assistant Director, Capital Projects

Phone: (832) 395-2365