HPW – 20SMC87 Amendment / Gunda Corporation, LLC

Agenda Item#: 43.


 
                               
Summary:

**PULLED – This item will not be considered on October 5th, 2022

ORDINANCE appropriating $1,459,426.12 out of Dedicated Drainage and Street Renewal Capital Fund – Ad Valorem Tax; approving and authorizing first amendment to Professional Engineering Services Contract between City of Houston and GUNDA CORPORATION for Fondren Paving and Drainage from Creekbend to West Airport (Approved by Ordinance No. 2015-0300); providing funding for CIP Cost Recovery relating to construction of facilities financed by the Dedicated Drainage and Street Renewal Capital Fund – Ad Valorem Tax - DISTRICT K - CASTEX-TATUM

Background:

SUBJECT: First Amendment to the Professional Engineering Services Contract between the City and Gunda Corporation, LLC for Fondren Paving and Drainage from Creekbend to West Airport.

 

RECOMMENDATION: Approve the First Amendment to the Professional Engineering Services Contract with Gunda Corporation, LLC and appropriate funds.

 

PROJECT NOTICE/JUSTIFICATION: This project is part of the Street and Traffic Capital Improvement Plan (CIP) and is necessary to meet City of Houston Standards as well as improve traffic circulation, mobility, and drainage in the service area. Deterioration of existing pavement and future traffic volume requires that the roadway be reconstructed.

 

DESCRIPTION/SCOPE: Fondren project consists of the design of approximately 8,000 linear feet, six-lane divided concrete roadway with storm drainage, curbs, sidewalk, driveways, street lighting, traffic control, and necessary underground utilities.

 

LOCATION: The project area is generally bound by Creekbend Drive on the north, West Airport Blvd. on the south, Sandpiper Drive on the east and Braesridge on the west. 

 

PREVIOUS HISTORY AND SCOPE: City Council approved the original contract on April 08, 2015 under Ordinance No. 2015-0300. The scope of services under this contract, the Consultant has accomplished 90% completion of the Design.

 

SCOPE OF THIS AMENDMENT AND FEE: Under the scope of the First Amendment, the Consultant will accomplish the following: Complete the redesign of Fondren Road and provide for Construction Phase Services. A fee of $938,600.00 is budgeted for Basic Services and $451,329.12 for Additional Services.

 

The total requested appropriation is $1,459,426.12 to be appropriated as follows: $1,389,929.12 for contract services and $69,497.00 for CIP Cost Recovery.

 

PAY OR PLAY PROGRAM: The proposed contract requires compliance with the City’s ‘Pay or Play’ ordinance regarding health benefits for employees of City Contractors. In this case, the Contractor provides health benefits to eligible employees in compliance with City policy.

 

M/WBE PARTICIPATION: The M/WBE goal established for this project is 24%. The original contract amount $1,656,625.00. The Consultant has been paid $1,419,309.00 (85.67%). Of this amount, $439,774.00 (30.99%) has been paid to M/WBE sub-contractors to date. Assuming approval of the requested additional appropriation, the contract amount will increase to $3,046,554.12. The Consultant proposes the following plan to meet the M/WBE goal.

 

Name of Firms

Work Description

Amount

% of Total Contract

Paid Prior M/WBE Commitment

 

$439,744.00

14.43%

Unpaid Prior M/WBE Commitment

 

$  46,260.00

1.52%

1. WSB & Associates, Inc. dba Nathelyne A. Kennedy & Associates, LP

Engineering, Street Lighting, Traffic Control Plans, Storm Water Pollution Prevention Plan

$301,990.00

9.91%

 

 

2. KUO & Associates, Inc.

 

Topographic Surveying

 

$  28,835.00

 

0.95%

3. B & E Reprographics, Inc.

Document Reproduction

$    7,000.00

0.23%

 

TOTAL

$823,829.00

27.04%

 

FISCAL NOTE: No significant Fiscal Operating impact is anticipated as a result of this project.

 

 

 

 

_________________________________

Carol Ellinger Haddock, P.E., Director

Houston Public Works

 

WBS No. N-100021-0001-3

Prior Council Action:
Ordinance No. 2015-0300, dated 04-08-2015
Amount and Source of Funding:

$1,459,426.12 - Fund No. 4046 - Dedicated Drainage and Street Renewal Capital Fund- Ad Valorem Tax. 

 

Original appropriation of $1,921,685.00 from Fund No. 4040 – METRO Projects Construction DDSRF.

Contact Information:

Juan Chavira, P.E., PMP, CEM

Assistant Director, Capital Projects

Phone: (832) 395-2441

ATTACHMENTS:
DescriptionType
Signed CoversheetSigned Cover sheet
Maps Backup Material