HAS – Construction Contract with PRCHOU LLC for the METRO Bus Drive Lane Reconstruction Project at HOU; Project No. 236

Agenda Item#: 24.


 
                               
Summary:

ORDINANCE appropriating $479,472.00 out of Airports Renewal and Replacement Fund, awarding Construction Contract to PRCHOU, LLC for Metropolitan Transit Authority (Metro) Bus Drive Lane Project at William P. Hobby Airport (Project 236); setting a deadline for the bidder’s execution of the contract and delivery of all bonds, insurance, and other required contract documents to the City; holding the bidder in default if it fails to meet the deadlines; providing funding for testing, and contingencies relating to the Metropolitan Transit Authority (Metro) Bus Drive Lane Project financed by Airports Renewal and Replacement Fund - DISTRICT I - GALLEGOS

Background:

Enact an ordinance approving and authorizing a Construction Contract with PRCHOU LLC for the METRO Bus Drive Lane Reconstruction Project at William P. Hobby Airport (HOU) and appropriating $479,472.00 from the Airports Renewal and Replacement Fund (Project No. 236).

 

SPECIFIC EXPLANATION:

The drive lane for Metropolitan Transit Authority of Harris County (METRO) buses and the associated concrete pavement, as well as the adjoining commercial traffic lane, along the Hobby Airport Loop have reached the end of useful life. PRCHOU will be responsible for the reconstruction of the two lanes of the commercial vehicle segment of the arrivals level roadway (approximately 580 feet in length). Located to the north of the terminal building at the ground level, between the Red Garage and the passenger pick-up area, the project also includes the replacement of non-functioning in-pavement lights, associated electrical conduit, conductors, crosswalk markings, and signage.

HAS and METRO have proposed that the project be divided in four construction phases to ensure roadways remain open during the construction duration.

 

Professional Engineering Services were provided by Atkins North America.

 

Bids:

An Invitation to Bid (ITB) was advertised in the Houston Chronicle on March 19, and March 26, 2021.Six bids were received on May 6, 2021 and are tabulated as follows:

 

                           Company                                                              Bid Total     

1. PRCHOU LLC

$ 378,727.00

2. Harper Brothers Construction, LLC

$ 493,488.00

3. Jerdon Enterprise L.P.

$ 531,226.50

4. Main Lane Industries LTD.

$ 563,940.00

5. Tikon Group, Inc.

$ 852,690.00

6. Spawglass Civil Construction, Inc.

$ 972,450.00

 

After review of the bids, HAS recommends that PRCHOU LLC be awarded this Contract based on their low, responsive bid meeting specifications in the amount of $378,727.00.

 

The contract duration is 180 calendar days.

 

PROJECT COSTS:

$        378,727.00     Construction Services

$         85,745.00      Contingency

$         15,000.00      Material Testing Services

$       479,472.00      TOTAL

 

Material Testing Services Contract:

Material Testing Services will be provided by Geotest Engineering, Inc., under Contract Number 4600016475.

 

Hire Houston First:

The proposed contract requires compliance with the City’s “Hire Houston First” (HHF) ordinance that promotes economic opportunity for Houston businesses and supports job creation. PRCHOU LLC is a designated HHF company, but they were the successful awardee without application of the HHF preference.

 

Pay or Play:

The proposed contract requires compliance with the City’s “Pay or Play” ordinance regarding health benefits for employees of City contractors. In this case, PRCHOU LLC will exercise the “Pay” option.

           

M/WBE Participation:

As this total construction contract amount is below $1,000,000.00, an M/WBE goal will not be applicable to this project.

 

CIP Fiscal Note:

No significant Fiscal Operating impact is anticipated as a result of this project.

 

Director’s Signature:

 

 

 

___________________

Mario C. Diaz

Houston Airport System

Amount and Source of Funding:

$479,472.00

Airports Renewal and Replacement Fund

Fund 8010

Contact Information:

Todd Curry              281/233-1896

Jarrett Simmons     281/233-1675