Item Coversheet

CITY OF HOUSTON - CITY COUNCIL

Meeting Date: 11/16/2021
District I
Item Creation Date: 8/19/2021

HPW – 20CG01 PES / Gradient Group, LLC

Agenda Item#: 27.


 
                               
Summary:

ORDINANCE appropriating $1,998,841.95 out of Dedicated Drainage and Street Renewal Capital Fund – Drainage Charge and approving and authorizing Professional Engineering Services Contract between City of Houston and GRADIENT GROUP, LLC for Magnolia Park Sec. 2 Area Drainage and Paving Subproject 2; providing funding for CIP Cost Recovery relating to construction of facilities financed by the Dedicated Drainage and Street Renewal Capital Fund – Drainage Charge - DISTRICT I - GALLEGOS

Background:

SUBJECT:  Professional Engineering Services Contract between the City and Gradient Group, LLC for Magnolia Park Sec. 2 Area Drainage and Paving Subproject 2.

 

RECOMMENDATION:  An ordinance approving a Professional Engineering Services Contract with Gradient Group, LLC for Magnolia Park Sec. 2 Area Drainage and Paving Subproject 2 and appropriate funds.

 

PROJECT NOTICE/JUSTIFICATION:  This project is part of the Build Houston Forward to address the needs identified and prioritized through a worst first methodology, objective data, and benefit/cost analysis.  It is required to improve the drainage of streets and reduce the risk of structural flooding.

 

DESCRIPTION/SCOPE:  This project consists of the design of storm drainage, concrete, paving, curbs, sidewalks, driveways, and underground utilities to serve Magnolia Park Sec. 2 Area.

 

LOCATION:  The project area is generally bound by Canal Street on the north, Harrisburg Boulevard on the south, East Navigation Boulevard on the east and North 77th Street on the west. 

 

SCOPE OF CONTRACT AND FEE:  Under the scope of the Contract, the Consultant will perform Phase I - Preliminary Design, Phase II Final Design, Phase III - Construction Phase Services and Additional Services. Basic Services Fee for Phase I is based on cost of time and materials with a not-to-exceed agreed upon amount.  The Basic Services Fees for Phase II and Phase III are based on a negotiated lump sum amount. The total Basic Services appropriation is $953,269.00.

 

The Contract also includes certain Additional Services to be paid either as a lump sum or on a reimbursable basis. The total Additional Services appropriation is $950,390.00.

 

The negotiated maximum for Phase I Services is $521,786.00.

 

The total cost of this project is $1,998,841.95 to be appropriated as follows: $1,903,659.00 for Contract services and $95,182.95 for CIP Cost Recovery.

 

PAY OR PLAY PROGRAM:  The proposed contract requires compliance with the City’s ‘Pay or Play’ ordinance regarding health benefits for employees of City contractors.  In this case, the Consultant provides health benefits to eligible employees in compliance with City policy.

 

M/WBE PARTICIPATION:  The standard M/WBE goal set for the project is 24.00%. The Consultant has proposed a 25.84% MWBE plan to meet the goal.

 

 

Name of Firms

Work Description

Amount

% of Total 

Contract

1.

Ally General Solutions, LLC

Traffic Support

$117,300.00

  6.16%

2.

Cypress Environmental

Consulting LLC

Environmental Engineering

55,160.00

  2.90%

3.

Geotest Engineering, Inc.

Geotechnical Engineering

$  78,208.00

  4.11 %

4.

Stevens Technical Services, Inc

Traffic Support

$241,268.00

12.67%

 

 

TOTAL

$491,936.00

25.84%

 

 

 

 

 

 

 

FISCAL NOTE:  No significant Fiscal Operating impact is anticipated as a result of this project.

 

 

 

____________________________

Carol Ellinger Haddock, P.E., Director

Houston Public Works

 

WBS No. M-410015-0002-3

Amount and Source of Funding:

$1,998,841.95- Fund No. 4042 - Dedicated Drainage and Street Renewal Capital Fund - Drainage Charge

Contact Information:

Juan Chavira, PE, PMP, CEM, ENV SP

Assistant Director, Capital Projects

Phone: (832) 395-2441

ATTACHMENTS:
DescriptionType
Signed CoversheetSigned Cover sheet
MapsBackup Material