Item Coversheet

CITY OF HOUSTON - CITY COUNCIL

Meeting Date: 10/5/2021
District A, District B, District C, District E, District G, District H, District K
Item Creation Date: 7/13/2021

20INA48 Resolution / Texas Department of Transportation

Agenda Item#: 8.


 
                               
Summary:

RESOLUTION supporting the request of a waiver of the local match requirements in the Federal Off-System Bridge Program (Lockwood Dr at UPRR, S. Braeswood Blvd at HCFCD Ditch, Campbell Rd at HCFCD Ditch, Enid St at Little White Oak Bayou) administered by the Texas Department of Transportation - DISTRICTS A - PECK; B - JACKSON; C - KAMIN; E - MARTIN; G - TRAVIS; H - CISNEROS and K - CASTEX-TATUM

Background:

SUBJECT:  Waiver of Local Match Participation for the Federal Off-System Bridge Program administered by the Texas Department of Transportation (TxDOT).

 

 RECOMMENDATION:  Approve a Resolution supporting the City of Houston’s request for a Waiver of the Local Match Participation Requirements for the Federal Off-System Bridge Program.

 

PROJECT NOTICE/JUSTIFICATIONThis project is part of the Federal Off-System Bridge Program which is administered by TxDOT to replace or rehabilitate structurally deficient and functionally obsolete bridges located on public roads and streets not located in the designated state highway system.  This Resolution will support a request for a waiver of the local match requirements of the program in return for the City agreeing to perform structural improvement work on other deficient bridges within the City’s roadway system program.

 

PROJECT SCOPE:  Under this program, the usual fund participation ratios for projects are 80 percent federal, 10 percent state and 10 percent local government.  The Texas Administrative Code, Title. 43, Section 15.55 provides that under specified conditions, the 10 percent local government match requirement may be waived if the local government performs an equivalent dollar amount of structural improvement work on another deficient bridge within its jurisdiction (Equivalent-Match Projects).  The Texas Transportation Commission approved Minute Order No. 115814 dated August 27, 2020 for the reconstruction of the bridges listed below under the Federal Off-System Bridge Program, hereinafter, referred to as “Participation Waiver” Project. This resolution requests TxDOT’s consideration of waiving the local match participation on the Participation-Waived Off-System Bridge Program by utilizing funds expended in the Bridge Rehabilitation/Replacement Program under the City’s Capital Improvement Plan.

 

Location of Bridge

National Bridge Inventory Number (NBI)

Control-Section-Job number (CSJ)

10% Local Government Participation Required

Lockwood Dr at UPRR/Liberty Rd

12-102-0-B40177-003

0912-72-557

$1,815,000

S. Braeswood Blvd at HCFCD Ditch

12-102-0-B09385-560

0912-72-559

$193,600

Campbell Rd at HCFCD Ditch

12-102-0-B11817-167

0912-72-580

$36,300

Enid St at Little White Oak Bayou

12-102-0-0B22569-921

0912-72-613

$121,000

 

Based on field investigations, the City of Houston has identified the following bridges as appropriate candidates for replacement under this program to receive the credit.

 

                         

LOCATION (and NBI structure identification number, if applicable)

ON SCHOOL BUS ROUTE?

DESCRIPTION OF STRUCTURAL IMPROVEMENT WORK

ESTIMATED COST

7200 Boyce at Drainage Ditch

Yes

Replace wood structure with concrete culvert

$211,250

11800 Aquaduct at Drainage Ditch

No

Replace wood structure with concrete culvert

$253,500

1135 Cimarron at Drainage Ditch

Yes

Replace wood structure with concrete culvert

$180,000

7600 Lavender at HCFCD Ditch

Yes

Replace wood structure with concrete culvert

$210,000

7200 Wiggins at HCFCD Ditch

Yes

Replace concrete culvert

$175,000

4700 Shreveport at HCFCD Ditch

Yes

Replace concrete culvert

$192,000

6500 Baton Rouge at HCFCD Ditch

Yes

Replace concrete culvert

$192,000

 

9100 Spring Branch

Yes

Replace concrete culvert

$192,000

 

1100 Hopper

Yes

Replace CMP with concrete culvert

$210,000

 

3800 Weaver

Yes

Replace CMP with concrete culvert

$210,000

80 West Oak Dr at Drainage Ditch

No

Replace wood structure with concrete culvert

$210,000

 

 

TxDOT proposes to replace existing deficient four span bridges with a single barrel concrete box culvert crossing, at a cost to the City for their 10% local match. The local match participation required for the reconstruction of the Participation-Waived bridges is $2,165,900.00.

 

FISCAL NOTENo significant Fiscal Operating Impact is anticipated as a result of this project.

 

ACTION RECOMMENDED:  It is recommended that City Council approve a Resolution supporting the Waiver of Local Match Participation for the Federal Off-System Bridge Program.

 

 

 

 

________________________________

Carol Ellinger Haddock, P.E., Director

Houston Public Works

 

WBS No(s). N-140012-0001-7

                    N-140011-0001-7

                    N-140013-0001-7

                    N-240009-0001-7

Contact Information:

Michael Wahl, P.E., PTOE

Assistant Director, Transportation & Drainage Operations

Phone: (832) 395-2443

ATTACHMENTS:
DescriptionType
Cover sheetSigned Cover sheet
MapBackup Material