Item Coversheet

CITY OF HOUSTON - CITY COUNCIL

Meeting Date: 10/19/2021
ALL
Item Creation Date: 6/11/2021

HPW-20TSR16-PES-Ally General Solutions, LLC

Agenda Item#: 36.


 
                               
Summary:

ORDINANCE appropriating $525,000.00 out of Metro Projects Construction DDSRF; approving and authorizing Professional Engineering Services Contract between City of Houston and ALLY GENERAL SOLUTIONS, LLC for Citywide Traffic Signal Improvements; providing funding for CIP Cost Recovery financed by the Metro Projects Construction DDSRF

Background:

 

SUBJECT: Professional Engineering Services Contract between the City of Houston and Ally General Solutions, LLC for Citywide Traffic Signal Improvements.

 

RECOMMENDATION:  An ordinance approving a Professional Engineering Services Contract with Ally General Solutions, LLC for Citywide Traffic Signal Improvements and appropriate funds.

 

PROJECT NOTICE/JUSTIFICATION: This project is part of the Street and Traffic Capital Improvement Program and is needed to meet City of Houston design and safety standards and improve traffic mobility.

 

DESCRIPTION/SCOPE: This project consists of traffic safety design improvements as well as construction ready plans, specifications and estimates for traffic intersections. This project will improve mobility and enhance safety on a work order basis as identified by Transportation and Drainage Operations.

 

LOCATION:  The projects are located throughout the City of Houston.

 

SCOPE OF CONTRACT AND FEE: Under the scope of the Contract, the Consultant will perform a variety of services such as data collection, traffic analysis, signal warrant analysis, signal timing development, traffic signal designs, conceptual geometric design, and construction documents for minor roadway geometric improvements. The term of this contract is one year with a one-year option. The total Basic Services appropriation is $375,000.00.

 

The Contract also includes certain Additional Services to be paid on a reimbursable basis. The Additional Services include Surveying, Engineering Design Support, Reproduction Services and Texas Department of Licensing and Regulation Services. The total Additional Services appropriation is $125,000,00.

 

The total cost of this project is $525,000.00 to be appropriated as follows: $500,000.00 for Contract services $25,000.00 for CIP Cost Recovery.

 

PAY OR PLAY PROGRAM: The proposed contract requires compliance with the City’s ‘Pay or Play’ ordinance regarding health benefits for employees of City contractors. In this case, the Contractor provides health benefits to eligible employees in compliance with City policy.

  M/WBE PARTICIPATION: The M/WBE goal for the project is  24.00%. The Consultant has proposed the following  to achieve this goal. 

 

FISCAL NOTE: No significant Fiscal Operating Impact is anticipated as a result of this project.

 

 

 

____________________________

Carol Ellinger Haddock, P.E., Director

Houston Public Works

 

WBS No. N-321040-0036-3

Amount and Source of Funding:

$525,000.00 from Fund 4040 Metro Projects Construction DDSRF

 

 

Contact Information:

Michael T. Wahl, P.E., PTOE

Assistant Director, Transportation and Drainage Operations

Phone: (832) 395-2443

 

ATTACHMENTS:
DescriptionType
Signed CoversheetSigned Cover sheet
MapBackup Material