Item Coversheet

CITY OF HOUSTON - CITY COUNCIL

Meeting Date: 4/20/2021
District K
Item Creation Date: 2/25/2021

HPW – 20LLL03 Amendment / TLC Engineering, Inc.

Agenda Item#: 49.


 
                               
Summary:

ORDINANCE appropriating $130,549.65 out of Dedicated Drainage and Street Renewal Capital Fund – Ad Valorem Tax; approving and authorizing first amendment to Professional Engineering Services Contract between City of Houston and TLC ENGINEERING, INC for Chimney Rock Connectivity to Fort Bend Tollway (Abide and Altair) (Approved by Ordinance No. 2017-0908); providing funding for CIP Cost Recovery relating to construction of facilities financed by the Dedicated Drainage and Street Renewal Capital Fund – Ad Valorem Tax - DISTRICT K - CASTEX-TATUM

TAGGED BY COUNCIL MEMBER CASTEX-TATUM

This was item 32 on Agenda of April 14, 2021

Background:

SUBJECT:  First Amendment to Professional Engineering Services Contract between the City and TLC Engineering, Inc. for Chimney Rock Connectivity to Fort Bend Tollway (Abide and Altair).

 

RECOMMENDATION:  Approve First Amendment to the Professional Engineering Services Contract with TLC Engineering, Inc. and appropriate funds.

 

PROJECT NOTICE/JUSTIFICATION:  This project is part of the Street and Traffic Capital Improvement Plan (CIP) and is necessary to extend Chimney Rock to serve as feeder/frontage roads along both sides of Fort Bend Toll Road. This program is required to extend this roadway to provide the missing area of pavement and access to the surrounding areas.

 

DESCRIPTION/SCOPE:  This project consists of the design of approximately 2,400 linear feet of two-lane roadway with associated drainage and utility modifications. Additionally, two local streets will be extended (Altair and Abide) to provide additional outlets for the neighboring community.

 

LOCATION:  The project area is generally bound by Main Street on the north, W. Orem Drive on the south, S. Post Oak Road on the east, and Summit Ridge Drive on the west.

 

PREVIOUS HISTORY AND SCOPE:  City Council approved the original Contract on November 29, 2017 under Ordinance No. 2017-0908. Under this Contract, the Consultant has completed the Preliminary Engineering Report.  On April 17, 2019 by Ordinance No. 2019-0273, City Council approved an Additional Appropriation. Under this Additional Appropriation, the Consultant has accomplished tasks Phase I – Preliminary Design and Phase II Final Design.

 

SCOPE OF THIS AMENDMENT AND FEE:  Under the scope of the First Amendment, the Consultant will accomplish the following:  Design and inspection of the additional sidewalks and modifications to the existing intersection at Chimney Rock and W. Orem Drive. A fee of $101,453.00 is budgeted for Basic Services and $22,880.00 for Additional Services.

 

The total requested appropriation is $130,549.65 to be appropriated as follows: $124,333.00 for contract services and $6,216.65 for CIP Cost Recovery.

 

PAY OR PLAY PROGRAM: The proposed contract requires compliance with the City’s ‘Pay or Play’ ordinance regarding health benefits for employees of City contractors. In this case, the Contractor has elected to pay into the Contractor Responsibility Fund in compliance with City policy.

 

M/WBE PARTICIPATION:  The M/WBE goal established for this project is 24%.  The original Contract amount and subsequent appropriation total $383,661.65.  The Consultant has been paid $313,686.47 (81.76%) to date.  Of this amount, $58,287.00 (18.58%) has been paid to M/WBE sub-consultants to date.  Assuming approval of the requested additional appropriation, the contract amount will increase to $507,994.65.  The Consultant proposes the following plan to meet the M/WBE goal.

 

Name of Firms

Work Description

Amount

% of Total

Contract

Paid Prior M/WBE Commitment

 

$  58,287.00

 11.47%

Unpaid Prior M/WBE Commitment

 

$  35,666.69

   7.03%

1. Landtech, Inc., DBA Landtech             

    Consultants Inc.

Surveying

$    9,472.00

   1.86%

2. THR Enterprises, Inc., DBA

    JNE Green Team, Inc.

General Management Consulting: Traffic Signal Design

$  20,800.00

__________

   4.09%

______

 

TOTAL

$124,225.69

24.45%

 

 

 

 

 

 

FISCAL NOTE: No significant Fiscal Operating impact is anticipated as a result of this project.

 

 

 

 

_________________________________

Carol Ellinger Haddock, P.E., Director

Houston Public Works

 

WBS No. N-100036-0001-3

Prior Council Action:

Ordinance No. 2017-0908, dated 11-29-2017

Ordinance No. 2019-0273, dated 04-17-2019

Amount and Source of Funding:

$130,549.65 - Fund No. 4046 - Dedicated Drainage & Street Renewal Capital Fund - Ad Valorem Tax

 

Original (previous) appropriation of $307,000.00 from Fund No. 4040 - METRO Projects Construction DDSRF and subsequent additional appropriation of $133,827.81 from Fund No. 4040 - METRO Projects Construction DDSRF (Supported by Thirds Party Funds: - METRO)

Contact Information:

Juan Chavira, PE, PMP, CEM

Assistant Director, Capital Projects

Phone: (832) 395-2441

ATTACHMENTS:
DescriptionType
Signed CoversheetSigned Cover sheet
MapsBackup Material