Item Coversheet

CITY OF HOUSTON - CITY COUNCIL

Meeting Date: 10/6/2020
District B
Item Creation Date: 7/24/2020

HPW – 20MEM34 PES / HR Green, Inc.

Agenda Item#: 33.


 
                               
Summary:

ORDINANCE appropriating $2,886,717.90 out of Water & Sewer System Consolidated Construction Fund; approving and authorizing Professional Engineering Services Contract between City of Houston and HR GREEN, INC for North Corridor Consolidation Package 4-36” Gravity Sewer from MUD 203 to Northgate Regional LS; providing funding for CIP Cost Recovery financed by Water & Sewer System Consolidated Construction Fund - DISTRICT B - DAVIS

Background:

SUBJECT: Professional Engineering Services Contract between the City and HR Green, Inc., for North Corridor Consolidation Pkg. 4 - 36" Gravity Sewer from MUD 203 to Northgate Regional LS.

 

RECOMMENDATION:  An ordinance approving a Professional Engineering Services Contract with HR Green, Inc., for North Corridor Consolidation Pkg. 4 - 36" Gravity Sewer from MUD 203 to Northgate Regional LS, and appropriate funds.

 

PROJECT NOTICE/JUSTIFICATION: This project is part of the wastewater facilities consolidation effort by the City and is required to divert wastewater flow from the MUD 203 Wastewater Treatment Plant to the Northgate Regional Lift Station via a 36-inch gravity line.

 

DESCRIPTION/SCOPE: This project consists of the design of a gravity sewer for the flow diversion from MUD 203 Wastewater Treatment Plant to Northgate Regional Lift Station.

 

LOCATION:  The project area is generally bound by Greens Road on the north, Beltway 8 North on the south, Greens Parkway on the east and Imperial Valley Drive on the west. 

 

SCOPE OF CONTRACT AND FEE: Under the scope of the Contract, the Consultant will perform Phase I - Preliminary Design, Phase II Final Design, Phase III - Construction Phase Services and Additional Services. Basic Services Fee for Phase I is based on cost of time and materials with not-to-exceed agreed upon amount. The total Basic Services appropriation is $1,350,609.00

 

The Contract also includes certain Additional Services to be paid either as lump sum or on a reimbursable basis. The total Additional Services appropriation is $1,273,680.00

 

The negotiated maximum for Phase I Services is $245,432.00

 

The total cost of this project is $2,886,717.90 to be appropriated as follows: $2,624,289.00 for Contract services and $262,428.90 for CIP Cost Recovery.

 

PAY OR PLAY PROGRAM: The proposed contract requires compliance with the City’s ‘Pay or Play’ ordinance regarding health benefits for employees of City contractors. In this case, the Contractor provides health benefits to eligible employees in compliance with City policy.

 

M/WBE PARTICIPATION: The M/WBE goal for the project is set at 24.00%.The Consultant has proposed the following firms to achieve this goal.

 

 

Name of Firms

Work Description

Amount

% of Total Contract

1.

Amani Engineering, Inc.

Engineering, Land Surveying

$84,220.00

3.21%

2.

B&E Reprographics, Inc.

Reproduction Services

$11,250.00

0.43%

3.

FCM Engineers, PC

Civil Engineering

$95,790.00

3.65%

4.

Kenall, Inc.

Geo-Technical and Environmental Engineering

$395,251.22

15.06%

5.

United Engineers, Inc.

Land Surveying Services

$260,000.00

9.91%

 

 

TOTAL

$846,511.22

32.26%

 

 

 

 

 

FISCAL NOTE: No significant Fiscal Operating impact is anticipated as a result of this project.

 

 

____________________________

Carol Ellinger Haddock, P.E., Director

Houston Public Works

 

WBS. No. R-000536-0031-3

Amount and Source of Funding:

$2,886,717.90 - Fund No. 8500 – Water and Sewer System Consolidated Construction

Contact Information:

R. Jeff Masek P.E., CCM

Assistant Director

Phone: (832) 395-2387

ATTACHMENTS:
DescriptionType
Signed CoversheetSigned Cover sheet
MapsBackup Material
2020-869 Executed OrdinanceOrdinance/Resolution/Motion