CITY OF HOUSTON - CITY COUNCIL

Meeting Date: 8/18/2020
District C
Item Creation Date: 6/26/2020

HPW-20INA12 Appropriation / Harris County Flood Control District

Agenda Item#: 40.


 
                               
Summary:

ORDINANCE appropriating $245,518.79 out of Metro Projects Construction DDSRF to the Interlocal Agreement between City of Houston and HARRIS COUNTY FLOOD CONTROL DISTRICT for Brays Bayou Flood Damage Reduction Plan for the Hillcroft Bridge (Approved by Ordinance No. 2003-1282); providing funding for CIP Cost Recovery and contingencies relating to construction of facilities financed by Metro Projects Construction DDSRF - DISTRICT C - KAMIN

Background:

SUBJECT:  Appropriation of funds to the Brays Bayou Flood Damage Reduction Plan (Project Brays) Interlocal Agreement between City of Houston (City) and Harris County Flood Control District (HCFCD) for the Hillcroft Bridge.

RECOMMENDATION:  Adopt an ordinance appropriating funds to the Brays Bayou Flood Damage Reduction Plan (Project Brays) Interlocal Agreement with HCFCD for the Hillcroft Bridge.

PROJECT NOTICE/JUSTIFICATION:  An Agreement was made and entered into pursuant to the Interlocal Cooperation Act (TEX-GOV'T CODE, ch.791) by and between the City and HCFCD. On June 13, 2000, Harris County Commissioners Court adopted Project Brays.  Project Brays is a joint effort by HCFCD and the Corp of Engineers to lower the water surface elevation within Brays Bayou up to 3 feet for the 100-year storm.  The lowering of the 100-year flood water level will reduce damaging floods which occur along the bayou.  The Brays Project will widen Brays Bayou thus requiring various bridges, which include the Hillcroft Bridge to be raised.

 

DESCRIPTION:  HCFCD has designed the Hillcroft Bridge to be raised by 15 inches, thus requiring the intersections and approaches to be reconstructed. The City has requested enhancements to the design of the proposed bridge project.  The enhancements consist of rehabilitating the bridge to provide four (4) 11-foot wide lanes with a center left turn lane and 9-foot sidewalks with handrails in lieu of the existing 4-foot sidewalks. 

 

LOCATION: The project is generally bound by North Braeswood to the north, South Braeswood  to the south, Chimney Rock to the east, and Fondren to the west.

 

SCOPE OF THE AGREEMENT AND FEE:  On December 17, 2003, under Ordinance 2003-1282, City Council approved the Interlocal Agreement. HCFCD will design and construct the bridge as part of the designated bridge projects declared within the Interlocal Agreement.  HCFCD will fund the replacement cost of this bridge and all necessary facilities.  The City will be 100% responsible for the additional engineering design and construction costs associated with the enhancements to the proposed bridge design. The County shall provide construction drawings and specifications and shall administer construction of the project.

 

The total cost for this project is $245,518.79 to be appropriated as follows: $188,860.61 for contract services, $37,772.12 for contingencies and $18,886.06 for CIP Cost Recovery.

 

FISCAL NOTENo significant Fiscal Operating Impact is anticipated as a result of this project.

 

ACTION RECOMMENDED:  It is recommended that City Council adopt an ordinance approving the appropriation of $245,518.79 for the Interlocal Agreement between the City of Houston and HCFCD.

 

 

_________________________________

Carol Ellinger Haddock, P.E.

Director

Houston Public Works

 

WBS No. N-000785-0044-7

Prior Council Action:

Ordinance No. 2003-1282, Dated:  12/17/2003

Amount and Source of Funding:
 $245,518.79 Fund No. 4040 - METRO Projects Construction DDSRF
Contact Information:

Darren Wilson

Acting Division Manager

Transportation & Drainage Operations

(832) 395-2244


ATTACHMENTS:
DescriptionType
Signed CoversheetSigned Cover sheet
MapsBackup Material
2020-719 Executed OrdinanceOrdinance/Resolution/Motion