Item Coversheet

CITY OF HOUSTON - CITY COUNCIL

Meeting Date: 10/1/2019
ALL
Item Creation Date: 8/13/2019

HPW-20MUK03 / Additional Appropriation / Consor Engineers, LLC

Agenda Item#: 32.


 
                               
Summary:

O2019-0752 ORDINANCE appropriating $110,000.00 out of Street & Traffic Control and Storm Drainage DDSRF as an additional appropriation to Professional Engineering Services Contract between the City of Houston and CONSOR ENGINEERS, LLC fka AIA ENGINEERS, LLC for FY2017 Local Drainage Project Work Order Design [Contract #1] (Approved by Ordinance No. 2017-0371); providing funding for CIP Cost Recovery relating to construction of facilities financed by the Street & Traffic Control and Storm Drainage DDSRF

Background:

SUBJECT: Additional Appropriation to the Professional Engineering Services Contract between City of Houston (City) and Consor Engineers, LLC (formerly AIA Engineers, LLC) for FY17 Local Drainage Project Work Order Design [Contract 1].

 

RECOMMENDATION: (SUMMARY) Approve an Ordinance appropriating additional funds to FY17 Local Drainage Project Work Order Design [Contract 1] with Consor Engineers, LLC (formerly AIA Engineers, LLC).

 

PROJECT NOTICE/JUSTIFICATION: This project is part of the Capital Improvement Plan (CIP) Program and is required to provide professional engineering services to address necessary local storm water drainage system and roadside ditch improvements and repairs citywide.

 

DESCRIPTION/SCOPE: This City-wide program provides professional engineering services to resolve localized storm water drainage problems that have been nominated by Transportation and Drainage Operations. The project scope is established by each work order. The work orders are prioritized based on a range of factors from public safety to level-of-service.

 

LOCATION:  The projects are located throughout the City.

 

PREVIOUS HISTORY AND SCOPE:  City Council approved the original Contract on May 24, 2017, under Ordinance No. 2017-0371. Under this Contract, the Consultant conducted drainage analyses, survey and design work under eight work authorizations throughout the City of Houston.

 

SCOPE OF THIS ADDITIONAL APPROPRIATION AND FEE:  This additional appropriation will continue Basic and Additional Phase I Preliminary Design Services, Phase II Final Design Services and Phase III Construction Services as they relate to existing and future storm water maintenance, rehabilitation and reconstruction projects throughout the City.

 

The total requested appropriation is $110,000.00 to be appropriated as follows: $100,000.00 for contract services and $10,000.00 for CIP Cost Recovery.

 

PAY OR PLAY PROGRAM: The proposed contract requires compliance with the City’s ‘Pay or Play’ ordinance regarding health benefits for employees of City contractors. In this case, the Contractor provides health benefits to eligible employees in compliance with City policy.

 

M/WBE PARTICIPATION: The M/WBE goal established for this project is 15 %. The original Contract amount totals $250,000.00. The Consultant has been paid $171,985.00 (68.79%) to date. Of this amount, $112,609.00 (65.48%) has been paid to M/WBE sub-consultants to date. Assuming approval of the requested additional appropriation, the contract amount will increase to $350,000.00. The Consultant proposes the following plan to meet the M/WBE goal.

 

Name of Firms

Work Description

Amount

% of Contract

Paid Prior M/WBE Commitment

$112,609.00

32.17%

Unpaid Prior M/WBE Commitment

$10,000.00

2.86%

1. CivilTech Engineering, Inc.

Civil Engineering Support

$8,000.00

2.29%

2. DAE & Associates Ltd., DBA

   Geotech Engineering and Testing

Geotechnical Services

$4,000.00

1.14%

3. Rahaman and Associates, Inc.,
   DBA Western Group Consultants

Surveying Services

$27,500.00

7.86%

TOTAL:

$162,109.00

46.32%

 

 

FISCAL NOTE: No significant Fiscal Operating Impact is anticipated as a result of this project.

 

 

 

 

____________________________________

Carol Ellinger Haddock, P.E., Director

Houston Public Works

 

WBS No. M-420126-0097-3

 

Prior Council Action:

Ordinance No. 2017-0371, dated May 24, 2017

Amount and Source of Funding:

$110,000.00

Street & Traffic Control and Storm Drainage DDSRF

Fund 4042

(Supported by Drainage Utility Charge).

 

Original (previous) Appropriation of $300,000.00 from Fund 4042 - Street  & Traffic Control and Storm Drainage DDSRF

Contact Information:

M. Umer Khan

Supervising Engineer, TDO

Phone: (832) 395-2946

ATTACHMENTS:
DescriptionType
Signed CoversheetSigned Cover sheet
MapBackup Material
Prior Council ActionBackup Material