Item Coversheet

CITY OF HOUSTON - CITY COUNCIL

Meeting Date: 10/1/2019
District G, District J
Item Creation Date: 8/1/2019

20HP218 Interlocal Agreement / Saint George Place Redevelopment Authority

Agenda Item#: 17.


 
                               
Summary:

TAGGED CM Laster ORDINANCE appropriating out of Street & Traffic Control & Storm Drainage DDSRF; approving and authorizing an Interlocal Agreement between the City of Houston and SAINT GEORGE PLACE REDEVELOPMENT AUTHORITY for Regional Flood Mitigation Project Study within City of Houston Reinvestment Zone No. 1; providing funding for the study and CIP Cost Recovery relating to Project Management Costs - DISTRICTS G - TRAVIS and J - LASTER

Background:

SUBJECT: Interlocal Agreement to contribute funds necessary to conduct an Advanced Feasibility Study between the City of Houston (City) and the Saint George Place Redevelopment Authority (Authority).

 

RECOMMENDATION: Approve an ordinance authorizing an Interlocal Agreement  for a Regional Flood Mitigation Project Study Within City of Houston Reinvestment Zone No. 1 between the City and the Authority and appropriate the funds.

 

PROJECT NOTICE/JUSTIFICATIONThis Interlocal Agreement is made and entered into pursuant to the Interlocal Cooperation Act (Tex.Gov’t Code Ann. Ch. 791) by and between the City and the Authority. Whereas, the Authority will conduct a Regional Flood Mitigation Project Study (Advanced Feasibility Study).

 

DESCRIPTION: The City and the Authority desire to increase the resiliency and reduce the risk of flooding for residential and commercial properties within an approximate 1.5 square mile low and moderate-income area within and around the City of Houston Reinvestment Zone No. 1. An Advanced Feasibility Study that will evaluate route options for the Project, develop a recommendation for the preferred route of the Project, define complete Project and life cycle costs, and identify Project funding options.

 

LOCATION:  The area includes approximately seven (7) square miles of the Buffalo Bayou watershed bound on the east by IH 610, on the south by IH-69, on the west by approximately Fondren Road and on the north by Buffalo Bayou. Key Map Grid No. 491.

 

SCOPE OF THE AGREEMENT AND FEE:  The City will be responsible for ownership and maintenance of a collection system network.  The Authority will be responsible for the administration of the Advanced Feasibility Study. The City hereby agrees to contribute $400,000.00 to the Authority solely for the Advanced Feasibility Study cost.  Unless the City Council makes further appropriations for this Interlocal Agreement, the City's obligation must not exceed $400,000.00.

 

The total requested amount of $440,000.00 is to be appropriated as follows: $400,000.00 for cost of the Advanced Feasibility Study and $40,000.00 for CIP Cost Recovery. The appropriations for CIP Cost Recovery are necessary to fund project management costs.

 

FISCAL NOTE: No significant Fiscal Operating Impact is anticipated because of this project.

 

 

 

 

_________________________________

Carol Ellinger Haddock, P.E.

Director

Houston Public Works

 

WBS No. M-T01296-0015-7

TIRZ No. 1

 

Amount and Source of Funding:

$440,000.00 - Fund No. 4042-Street & Traffic Control and Storm Drainage DDSRF

($440,000.00 Supported by Drainage Utility Charge)

 

 

 

 

Contact Information:

Hien Pham, P.E.

Managing Engineer

Transportation and Drainage Operations

Phone: (832) 395-2366

 

ATTACHMENTS:
DescriptionType
Signed CoversheetSigned Cover sheet
MapsBackup Material