Item Coversheet

CITY OF HOUSTON - CITY COUNCIL

Meeting Date: 2/18/2020
District E
Item Creation Date: 7/5/2019

HPW – 20EN34 PES / CDM Smith Inc.

Agenda Item#: 35.


 
                               
Summary:

ORDINANCE appropriating $4,188,335.00 out of Water & Sewer System Consolidated Construction Fund; approving and authorizing a Professional Engineering Services Contract between the City of Houston and CDM SMITH, INC for Southeast Wastewater Treatment Plant Expansion Package #2; providing funding for CIP Cost Recovery financed by the Water & Sewer System Consolidated Construction Fund - DISTRICT E - MARTIN

Background:

SUBJECT:   Professional Engineering Services Contract between the City and CDM Smith Inc., for Southeast Wastewater Treatment Plant Expansion Package-2.

 

RECOMMENDATION:  An ordinance approving a Professional Engineering Services Contract with CDM Smith Inc., for Southeast Wastewater Treatment Plant Expansion Package-2 and appropriate funds.

 

PROJECT NOTICE/JUSTIFICATION: This project is part of the City’s ongoing program to renew/replace inefficient components of the existing wastewater treatment plant facilities.

 

The work to be performed under this contract award is necessary to maintain compliance with Houston's proposed wastewater consent decree with EPA and TCEQ.

 

DESCRIPTION/SCOPE: This project consists of the design of the Southeast Wastewater Treatment Plant  Package-2 expansion to 15.14 million gallons per day average annual daily flow and 72.33 million gallons per day 2-hour design peak flow to accept flows from Sagemont WWTP and Easthaven WWTP.

   

LOCATION:  The plant is located at 9610 Kingspoint Road, Houston Texas 77075.

 

SCOPE OF CONTRACT AND FEE: Under the scope of the Contract, the Consultant will perform Phase I - Preliminary Design, Phase II – Final Design, Phase III -Construction Phase Services and Additional Services. Basic Services Fee for Phase I is based on cost of time and materials with not-to-exceed agreed upon amount. The total Basic Services appropriation is $3,218,950.00

 

The Contract also includes certain Additional Services to be paid either as lump sum or on a reimbursable basis. The total Additional Services appropriation is $588,627.00

 

The negotiated maximum for Phase I Services is $795,154.00

 

The total cost of this project is $4,188,335.00 to be appropriated as follows: $3,807,577.00 for Contract services and $380,758.00 for CIP Cost Recovery.

 

PAY OR PLAY PROGRAM: The proposed contract requires compliance with the City’s ‘Pay or Play’ ordinance regarding health benefits for employees of City contractors. In this case, the Contractor provides health benefits to eligible employees in compliance with City policy.

 

M/WBE PARTICIPATION: The M/WBE goal for the project is set at 24.00%. The Consultant has proposed the following firms to achieve this goal.

 

 

Name of Firms

Work Description

Amount

% of Total Contract

1.

Kalluri Group, Inc.

Electrical Engineering Services

$360,000.00

9.45%

2.

KIT Professionals, Inc.

Professional Engineering Services

$456,000.00

11.98%

3.

ISANI Consultants, L.P.

Professional Engineering Services

$168,140.00

4.42%

4.

Mbroh Engineering, Inc.

Instrumentation and SCADA Engineering Services

$175,000.00

4.60%

5.

HVJ Associates, Inc.

Geotechnical Engineering Services

$50,000.00

1.31%

 

 

TOTAL

$1,209,140.00

31.76%



FISCAL NOTE: No significant Fiscal Operating impact is anticipated as a result of this project.

 

 

 

____________________________________

Carol Ellinger Haddock, P.E., Director

Houston Public Works

 

WBS No. R-000265-0148-3

Amount and Source of Funding:
$4,188,335.00 - Fund No. 8500 – Water and Sewer System Consolidated Construction
Contact Information:
R. Jeff Masek, P.E., CCM

Assistant Director, Capital Projects

Phone: (832) 395-2387


ATTACHMENTS:
DescriptionType
Signed CoversheetSigned Cover sheet
MapsBackup Material