Item Coversheet

CITY OF HOUSTON - CITY COUNCIL

Meeting Date: 9/24/2019
District D, District I
Item Creation Date: 6/28/2019

HPW – 20MEM17 PES / IDS Engineering Group, Inc.

Agenda Item#: 29.


 
                               
Summary:

2019-0728 ORDINANCE appropriating $3,325,455.75 out of Water & Sewer System Consolidated Construction Fund and approving and authorizing Professional Engineering Services Contract between the City of Houston and IDS ENGINEERING GROUP, INC for Flow Diversion from Easthaven to Southeast Wastewater Treatment Plant; providing funding for CIP Cost Recovery relating to construction of facilities financed by the Water and Sewer System Consolidated Construction Fund DISTRICTS D - BOYKINS and I - GALLEGOS

Background:

SUBJECT: Professional Engineering Services Contract between the City and IDS Engineering Group, Inc., for Flow Diversion from Easthaven to Southeast Wastewater Treatment Plant. 

 

RECOMMENDATION:  An ordinance approving a Professional Engineering Services Contract with IDS Engineering Group, Inc., for Flow Diversion from Easthaven to Southeast Wastewater Treatment Plant and appropriate funds.

 

PROJECT NOTICE/JUSTIFICATION: This project is part of the City’s Wastewater Treatment Plant Consolidation Plan and is required to implement decommission of Easthaven Wastewater Treatment Plant.

 

DESCRIPTION/SCOPE: This project consists of the flow diversion from Easthaven Wastewater Treatment Plant to Southeast Wastewater Treatment Plant.

 

LOCATION: 

 

Project Name

Location

Key Map Grid

Council District

Easthaven WWTP

4545 Scranton Street

575G

I

Southeast WWTP

9610 Kingspoint Road

576W

D

Wingtip Lift Station

9555 Wingtip Drive

575P

D

Ballantine Lift Station

10589 Ballantine Street

575T

D

Easthaven Lift Station

9947 Easthaven Boulevard

575R

D

Southridge Lift Station

10040 Radio Road

575R

D

 

SCOPE OF CONTRACT AND FEE: Under the scope of the Contract, the Consultant will perform Phase I - Preliminary Design, Phase II – Final Design, Phase III -Construction Phase Services and Additional Services. Basic Services Fee for Phase I is based on cost of time and materials with not-to-exceed agreed upon amount. The total Basic Services appropriation is $1,744,140.00

 

The Contract also includes certain Additional Services to be paid either as lump sum or on a reimbursable basis. The total Additional Services appropriation is $1,279,000.00

 

The negotiated maximum for Phase I Services is $446,200.00

 

The total cost of this project is $3,325,455.75 to be appropriated as follows: $3,023,140.00 for Contract services and $302,315.75 for CIP Cost Recovery.

 

PAY OR PLAY PROGRAM: The proposed contract requires compliance with the City’s ‘Pay or Play’ ordinance regarding health benefits for employees of City contractors. In this case, the Contractor provides health benefits to eligible employees in compliance with City policy.

 

M/WBE PARTICIPATION: The M/WBE goal for the project is set at 24.00%. The Consultant has proposed the following firms to achieve this goal.

 

 

Name of Firms

Work Description

Amount

% of Total Contract

1.

Aviles Engineering Corporation

Geotech & Environmental Engineering Services

$610,000.00

20.18%

2.

B & E Reprographics, Inc.

Engineering Support Services

$5,000.00

0.17%

3.

KIT Professionals, Inc.

Engineering Support Services

$205,000.00

6.78%

4.

Kuo & Associates, Inc.

Surveying Services

$270,000.00

8.93%

 

 

TOTAL

$1,090,000.00

36.06%

 

FISCAL NOTE: No significant Fiscal Operating impact is anticipated as a result of this project.

 

 

____________________________

Carol Ellinger Haddock, P.E., Director

Houston Public Works

 

WBS No. R-000536-0034-3

Amount and Source of Funding:

$3,325,455.75

 Water and Sewer System Consolidated Construction

Fund No. 8500

Contact Information:
R. Jeff Masek, P.E., CCM

Assistant Director, Capital Projects

Phone: (832) 395-2387
ATTACHMENTS:
DescriptionType
Signed CoversheetSigned Cover sheet
MapsBackup Material