Item Coversheet

CITY OF HOUSTON - CITY COUNCIL

Meeting Date: 11/27/2018
ALL
Item Creation Date: 10/16/2018

HPW-20KW05 - Addtn'l Approp / Nedu Engineering Services, Inc.

Agenda Item#: 51.


 
                               
Summary:

ORDINANCE appropriating $330,000.00 out of Street & Traffic Control and Storm Drainage DDSRF as an additional appropriation to Professional Engineering Services Contract between the City of Houston and NEDU ENGINEERING, INC for FY 17 Local Drainage Project Work Order Design Contract 2 (approved by Ordinance No. 2017-0372); providing funding for CIP Cost Recovery relating to construction of facilities financed by the Street & Traffic Control and Storm Drainage DDSRF - DISTRICT E - MARTIN

Background:

SUBJECT: Additional Appropriation to Professional Engineering Services Contract between the City and Nedu Engineering Services, Inc. for FY 17 Local Drainage Project Work Order Design Contract 2.

 

RECOMMENDATION: (SUMMARY) Approve an ordinance appropriating additional funds to the Professional Engineering Services Contract with Nedu Engineering Services, Inc.

 

PROJECT NOTICE/JUSTIFICATION: This project is part of the Capital Improvement Plan (CIP) Program. This program is required to provide professional engineering services to address necessary local storm water drainage system and roadside ditch improvements and repairs citywide.

 

DESCRIPTION/SCOPE: This project consists of professional engineering services to resolve localized storm water drainage problems that have been nominated by the Transportation and Drainage Operations. The project scope is established by each work order. The work orders are prioritized based on a range of factors from public safety to level-of-service.

LOCATION: The projects are located throughout the City of Houston.

PREVIOUS HISTORY AND SCOPE:  City Council approved the original contract on May 24, 2017, under Ordinance No. 2017-0372. The scope of work under the Original contract consisted of professional engineering services for Local Drainage Project work orders. Under this contract, the Consultant completed engineering investigations and design as determined by work orders.

 

SCOPE OF THIS ADDITIONAL APPROPRIATION AND FEE: The requested additional appropriation will accomplish the following tasks: Phase I Preliminary Design Basic and Additional Services, Phase II Final Design Basic and Additional Services, and Phase III Construction Phase Services, as defined by each work order. The Basic an Additional Services fee for each work order will be negotiated based on the scope of service required and all Phases will be paid on a reimbursable basis with authorization not-to-exceed the agreed amount.

 

The total requested appropriation is $330,000.00 to be appropriated as follows: $300,000.00 for contract services and $30,000.00 for CIP Cost Recovery.

 

PAY OR PLAY PROGRAM: The proposed contract requires compliance with the City’s ‘Pay or Play’ ordinance regarding health benefits for employees of City contractors. In this case, the Contractor provides health benefits to eligible employees in compliance with City policy.

 

M/WBE PARTICIPATIONThe M/WBE goal established for this project is 15%. The original Contract amount totals $250,000.00. The Consultant has been paid $164,400.25 or 65.76% to date. Of this amount, $21,816.25 or 13.27 % has been paid to M/WBE sub-consultants to date. Assuming approval of the requested additional appropriation, the contract amount will increase to $550,000.00. The Consultant proposes the following plan to meet the M/WBE goal.

 

Name of Firms

Work Description

Amount

% of Contract

Paid Prior M/WBE Commitment

 

$21,816.25

3.97%

Unpaid Prior M/WBE Commitment

 

$15,683.75

2.85%

 

1. Rahaman and Associates, Inc.,   DBA Western Group Consultants

Surveying Services

$18,800.00

3.42%

2. Jag Engineering, Inc.

Surveying Services

$18,800.00

3.42%

3. Austin-Reed Engineers, LLC

Geotechnical Services

$1,500.00

0.27%

4. GC Engineering, Inc.

Engineering Services

$5,520.00

1.00%

5. B&E Reprographics, Inc..

Reproduction Services

$900.00

0.16%

 

 

TOTAL

 

$83,020.00

 

15.09%

 

 

FISCAL NOTE:  No significant Fiscal Operating impact is anticipated as a result of this project.

 

 

 

 

____________________________________

Carol Ellinger Haddock, P.E.

Director

Houston Public Works

 

WBS No. M-420126-0098-3


Prior Council Action:

Ordinance 2017-0372, dated 05/24/2017


Amount and Source of Funding:

$330,000.00 from Fund No. 4042 - Street & Traffic Control and Storm Drainage DDSRF (Supported by Drainage Utility Charge)

 

Original (previous) appropriation of $300,000.00 from Fund No. 4042 - Street & Traffic Control and Storm Drainage DDSRF.  


Contact Information:

Kent Wu, P.E., CFM

Engineer

Transportation & Drainage Operations

611 Walker St., 20th Floor

Phone: (832) 395-2277


ATTACHMENTS:
DescriptionType
Signed CoversheetSigned Cover sheet
MapBackup Material