Item Coversheet

CITY OF HOUSTON - CITY COUNCIL

Meeting Date: 3/27/2018
District C, District H
Item Creation Date: 11/29/2017

20TD02 Amendment / Cobb, Fendley & Associates, Inc.

Agenda Item#: 18.


 
                               
Summary:

ORDINANCE appropriating $762,000.00 out of Street and Traffic Control and Storm Drainage DDSRF as an additional appropriation; approving and authorizing first amendment to Professional Engineering Services Contract between the City of Houston and COBB, FENDLEY & ASSOCIATES, INC for Neighborhood Street Reconstruction (NSR) 460 (Approved by Ordinance No. 2014-0401); providing funding for CIP Cost Recovery relating to construction of facilities financed by the Street and Traffic Control and Storm Drainage DDSRF - DISTRICTS C - COHEN and H - CISNEROS

Background:

SUBJECT: First Amendment to the Professional Engineering Services Contract between the City and Cobb, Fendley & Associates, Inc. for Neighborhood Street Reconstruction (NSR) 460.

 

RECOMMENDATION: (SUMMARY) Approve First Amendment to Professional Engineering Services Contract with Cobb, Fendley & Associates, Inc. and appropriate additional funds.

 

PROJECT NOTICE/JUSTIFICATION: This project is part of the Capital Improvement Plan which replaces existing residential streets that have deteriorated beyond economical repair and normal maintenance. This program will improve the condition of residential streets with storm drainage, curbs, sidewalks, driveways, street lighting, and necessary underground utilities, in addition to enhancing the quality of life in the neighborhoods.

 

DESCRIPTION/SCOPE: This project consists of the design of neighborhood streets for reconstruction. The proposed improvements will consist of concrete roadways and curbs, sidewalks, and underground utilities, as required.

 

LOCATION: The additional streets to be included in NSR 460 are shown below:

 

 

Street

Limits

Key Map Grid

Council District

 

1.

Grinnell

E.26th to Link

453 T

H

2.

East 26th

N. Main to Princeton

453 T

H

3.

East 26th

Baylor to Airline

453 T

H

4.

East 27th

Link to Airline

453 T

H

5.

Link

E.27th to Aurora

453 T

H

6.

Cornell

E.26th to Aurora

453 S

H

7.

Baylor

E.25th to Aurora

453 T

H

8.

Princeton

E.28th to E 26th

453 S

H

9.

Aurora

Link to Airline

453 T

H

10.

Northwood

Temple St. to N. Main

453 X

H

11.

W. Cottage

Moss to N. Main

453 X

H

12.

Temple

Moss to N. Main

453 X

H

13.

Melwood

Moss to N. Main

453 X

H

14.

Enid

W. Cottage to N. Main

453 X

H

15.

Tabor

Pecore to Temple

453 X

H

16.

10th, East

Heights to Harvard

493 A

C

17.

12 ½, East

Oxford to Studewood

453 W

C

18.

17th, West

Nicholson to Ashland

452 Z

C

19.

18th, West

Nicholson to Ashland

452 V

C

20.

Ashland

West 9th to West 11th

452 Z, 492 D

C

21.

Columbia

East 18th to East 20th

453 S

C

22.

Granberry

East 5 ½ to White Oak

493 A

C

23.

Le Green

Beverly to Studewood

453W

C

24.

Oxford

East 12th to East 13th

453W

C

 

 

 

 

 

PREVIOUS HISTORY AND SCOPE: The Scope of Services consisted of designing for the replacement of residential streets that have deteriorated beyond economical repair and normal maintenance. City Council approved the Original Contract on April 30, 2014 under Ordinance No. 2014-0401. The consultant has completed Phase I Basic and Additional services as well as Phase II final design to 60% for both the original streets assigned to the project, and the additional streets required to provide a comprehensive drainage design, per recommendation of the Preliminary Engineering Report dated December 11, 2015.  The Scope of Services under the Original Contract consisted of performing Phase I Preliminary Design, Phase II Final Design, Phase III Construction Phase Services and Additional Services. This amendment and additional funds are required for the inclusion of the added streets.

 

SCOPE OF THIS AMENDMENT AND FEE: The scope of this amendment will fund the completion of the Phase II Final Design and Phase III Construction Services. The amount of $650,736.00 is budgeted as Basic Services Fee.

 

The total requested funding is $762,000.00 to be appropriated as follows: $650,736.00 for Contract Services, and $111,264.00 for CIP Cost Recovery.

 

PAY OR PLAY PROGRAM: The proposed contract requires compliance with the City’s ‘Pay or Play’ ordinance regarding health benefits for employees of City contractors. In this case, the Consultant provides benefits for some employees but will pay into the Contractor Responsibility Fund for others, in compliance with City policy.

 

M/WBE PARTICIPATIONThe M/WBE goal established for this project is 24%. The original Contract amount totals $992,100.00. The consultant has been paid $821,683.88 (82.82%) to date. Of this amount, $195,625.00 (23.81%) has been paid to M/WBE sub-consultants to date. Assuming approval of the requested additional appropriation, the contract amount will increase to $1,642,836.00. The Consultant proposes the following plan to meet the M/WBE goal:

 

 

Name of Firms

Work Description

Amount

% of Total Contract

 

Paid Prior M/WBE Commitment

 

$195,625.00

11.91%

 

Unpaid Prior M/WBE Commitment

 

$96,747.00

5.89%

1.

Entech Civil Engineers, Inc.

Demolition Plans

$7,069.00

0.43%

2.

Geotest Engineering, Inc.

Geotechnical Engineering Environmental Site Assessment Phase II

$28,107.00

1.71%

3.

Gunda Corporation, LLC

Street Lighting Plan and Traffic Control Plan

$40,795.00

2.48%

4.

Kuo & Associates, Inc.

Topographic Survey and Base Plan Drawings

$33,048.00

2.01%

5.

Watearth, Inc.

Storm Water Pollution Prevention Plans

$13,371.75

0.81%

 

 

TOTAL

$414,762.75

25.25%

 

FISCAL NOTE: No significant Fiscal Operating impact is anticipated as a result of this project.

 

 

 

____________________________________

Carol Ellinger Haddock, P.E.

Director

Houston Public Works

 

WBS No. N-000389-0001-3

Prior Council Action:

Ordinance No. 2014-0401, dated April 30, 2014


Amount and Source of Funding:

$762,000.00 from Fund No. 4042 - Street and Traffic Control and Storm Drainage DDSRF

($762,000.00 supported by Drainage Fee)

 

Original (previous) appropriation of $1,141,000.00 from Fund No. 4042A – Street & Traffic Control and Storm Drainage DDSRF-A.


Contact Information:

Brian P. Alcott, P.E.

Acting Senior Assistant Director, Capital Projects

Phone: (832) 395-2355


ATTACHMENTS:
DescriptionType
Signed Coversheet Signed Cover sheet
MapsBackup Material