Item Coversheet

CITY OF HOUSTON - CITY COUNCIL

Meeting Date: 9/12/2017
ALL
Item Creation Date: 5/9/2017

20PSK01 Amendment / Stantec Consulting Services, Inc.

Agenda Item#: 33.


 
                               
Summary:

ORDINANCE appropriating $350,000.00 out of Water & Sewer System Consolidated Construction Fund as an additional appropriation; approving and authorizing first amendment to Professional Construction Management and Inspection Services Contract between the City of Houston and STANTEC CONSULTING SERVICES, INC for Large Diameter Water Line Construction Project (Approved by Ordinance No. 2014-0414)

Background:

SUBJECT: First Amendment and Additional Appropriation to Construction Management and Inspection Services Contract between the City of  Houston and Stantec Consulting Services, Inc. for Large Diameter Water Line Construction Project; WBS No. S-000900-0141-4.

 

RECOMMENDATION: (Summary) Approve First Amendment to Construction Management and Inspection Services Contract with Stantec Consulting Services, Inc. and appropriate additional funds.

 

PROJECT NOTICE/JUSTIFICATION: These projects are associated with Surface Water Transmission Program (SWTP). This program is required to meet Harris-Galveston Coastal Subsidence District’s Legislative mandate to regulate the withdrawal of groundwater.

 

DESCRIPTION/SCOPE: This Contract provides for Construction Management and Inspection Services for the Construction Branch of the Department of Public Works and Engineering in connection with Large Diameter Water Line Construction Projects.

 

LOCATION: The projects are located throughout the City of Houston.

 

PREVIOUS HISTORY AND SCOPE:  The original Construction Management and Inspection Services contract with Stantec Consulting Services, Inc. was approved on May 7, 2014 under Ordinance No. 2014-0414 and appropriated $200,000.00 for limited pre-construction review. The Construction Branch has issued four (4) work authorizations under this contract.  The work authorizations are listed below:

 

WA. No.

Project

Ordinance #

Appropriated

Authorized

1.

Large Diameter Waterline Construction Management

2017-0414

$200,000.00

$181,750.00

2.

60 Inch Raw Water Line Condition Assessment

2014-0553

$215,000.00

$214,916.00

3.

Condition Assessment of 96-inch Water Line along Clinton Drive from N. Wayside to IH-610

2015-0843

$291,044.00

$289,858.00

4.

84-inch Water Line Interconnection at East Water Purification Plant (EWPP)

2015-0307

$435,500.00

$435,355.00

5.

EWPP Low Lift Pump Station Direct Connection

2016-0471

$715,420.00

$650,381.00

 

 

SCOPE OF AMENDMENT AND FEE:The purpose of this amendment is to add One (1) year Contract Term Extension and appropriate additional funds to accomplish additional pre-construction reviews which were not budgeted as part of the original contract.

 

The total amount of $350,000.00 is to be appropriated for Contract services.

 

PAY OR PLAY PROGRAM: The proposed contract requires compliance with the City’s “Pay or Play” ordinance regarding health benefits for employees of City contractors. In this case, the contractor provides health benefits to eligible employees in compliance with City policy.

 

M/WBE PARTICIPATION: The M/WBE goal established for this contract is 24%.  The current total authorization for this contract is $1,772,260.00  The consultant has been paid $864,191.24 (48.76%) to date.  Of this amount, $127,798.25 (14.79%) has been paid to M/WBE sub-consultants to date.  The Consultant has proposed the following firms to achieve the M/WBE goal of 24%.

 

 

Name of Firm

Work Description

Percent

1.

KIT Professionals, Inc.

Inspection Services

12%

2.

Othon, Inc.

Inspection Services

12%

 

 

 

 

 

ESTIMATED FISCAL OPERATING IMPACT: No significant Fiscal Operating impact is anticipated as a result of this project.

 

 

 

 

___________________________________

Carol Ellinger Haddock, P.E., Acting Director

Department of Public Works and Engineering

 

WBS No. S-000900-0141-4

Prior Council Action:

Ordinance # 2014-0414 Dated: 05/07/2014

Ordinance # 2014-0553 Dated: 06/04/2014

Ordinance # 2015-0843 Dated: 09/02/2015

Ordinance # 2015-0307 Dated: 04/08/2015

Ordinance # 2016-0471 Dated: 06/15/2016


Amount and Source of Funding:

$350,000.00 from the Water and Sewer System Consolidated Construction Fund No. 8500.

 

Previous (original) and subsequent appropriations of $1,856,964.00 from the Water and Sewer System Consolidated Construction Fund No. 8500.
Contact Information:

Joseph T. Myers, P.E.                                

Senior Assistant Director                       

Phone: (832) 395-2355


ATTACHMENTS:
DescriptionType
Signed RCASigned Cover sheet
MapBackup Material