RECOMMENDATION from Acting Director Department of Public Works & Engineering for approval of final contract amount of $840,173.86 and acceptance of work on contract with ISI CONTRACTING, INC for Work Order Bridge Rehabilitation/Replacement Citywide  1.16% under the original contract amount - DISTRICTS H - CISNEROS and K - GREEN

Background:

SUBJECT: Accept Work for Work Order Bridge Rehabilitation/Replacement Citywide

WBS No. N-320445-0002-4.

 

RECOMMENDATION: (SUMMARY) Pass a motion to approve the final Contract Amount of $840,173.86 or 1.16% under the original Contract Amount, accept the Work and authorize final payment.

PROJECT NOTICE/JUSTIFICATION: This was a Work Order bridge related repair project primarily for miscellaneous type of bridge repair work throughout the City of Houston.  The scope of the work included mobilization, traffic control, removal and replacement of approach slabs, guard rails, slope paving, etc.

DESCRIPTION/SCOPE: The project detailed in the contract was for bridge related repairs in various locations throughout the City of Houston.  The scope of work was determined by work orders which were issued on an as-needed basis. Two work orders were issued.  Work order #1 was issued to complete the repair of the Gulfbank Bridge over the Hardy Toll Road.  Work order #2 was issued to repair the southbound Hillcroft Bridge over Willow Waterhole.  The project was prepared in-house by the Department of Public Works and Engineering staff with 550 calendar days allowed for construction.  The project was awarded to ISI Contracting, Inc. with an Adjustment Factor of 1.250 rather than a monetary amount.  The Adjustment Factor was applied on individual unit price items in the Contract documents.  Estimated work order prices were calculated by multiplying the Unit Quantity of each item in the work order by the Unit Price and the Adjustment Factor.  The total expenditure available for the entire project was $850,000.00.

LOCATION:

 

Description

Council District

Key Map Grid

Gulf Bank Road over Hardy Toll Road

H

413L

SB Hillcroft Bridge Over Willow Waterhole

K

571 A

 

CONTRACT COMPLETION AND COST: The Contractor, ISI Contracting, Inc, has completed the work under the subject Contract. The project was completed on time with an additional 365 days approved by Change Order No. 2. The final cost of the project, including overruns and underruns of estimated unit price quantities and previously approved Change Orders No. 1 and 3, is $840,173.86, a decrease of $9,826.14, or 1.16% under the original Contract Amount. The decreased cost is a result of the difference between planned and measured quantities.

The decreased cost is a result of the difference between planned and measured quantities. This decrease is primarily the result of an underrun in various Base Unit Price Items and Extra Unit Price Items, which was not necessary to complete the project.

 

M/WBE PARTICIPATION: No City M/WBE participation goal is established for this project as the contract amount does not exceeds the threshold of $1,000,000.00 required for a goal oriented contract per Section 15-82 of the Code of Ordinance.

 

All known right-of-way, easements and/or right-of-entry required for the project have been acquired.

 

 

 

 

_________________________________

Carol Ellinger Haddock, PE

Acting Director

Department of Public Works and Engineering

 

WBS No. N-320445-0002-4

 

 

Prior Council Action:
Ordinance 2014-0672     dated 06-25-2014
Amount of Funding:

No additional funding required.

 

Total (original) appropriation of $982,000.00 from Fund 4040-METRO Projects Construction DDSRF


Contact Information:

Joseph T. Myers, P.E.

Senior Assistant Director,

Capital Projects

Phone: (832) 395-2355


ATTACHMENTS:
DescriptionType
Signed CoversheetSigned Cover sheet
MAPSBackup Material