Item Coversheet

CITY OF HOUSTON - CITY COUNCIL

Meeting Date: 6/27/2017
District A, District B, District C, District F
Item Creation Date: 5/1/2017

20IMR99/PES/Garver,LLC

Agenda Item#: 32.


 
                               
Summary:

ORDINANCE appropriating $1,703,700.00 out of Water & Sewer System Consolidated Construction Fund and approving and authorizing Professional Engineering Services Contract between the City of Houston and GARVER, LLC for Lift Station Renewal and Replacement - Park Ten #1, Northborough Drive #1, Northborough Drive #2, Old Katy Road, Richmond #1 and Bonner Road Lift Stations; providing funding for contingencies relating to construction of facilities financed by the Water & Sewer System Consolidated Construction Fund - DISTRICTS A - STARDIG; B - DAVIS; C - COHEN and F - LE

Background:

SUBJECT: Professional Engineering Services Contract between the City and Garver, LLC for Lift Station Renewal and Replacement. WBS No. R-000267-0161-3

 

RECOMMENDATION: (SUMMARY)

An ordinance approving a Professional Engineering Services Contract with Garver, LLC and appropriate funds.

 

PROJECT NOTICE/JUSTIFICATION: This project is part of the City’s ongoing program to upgrade its wastewater lift stations facilities.

 

DESCRIPTION/SCOPE: This project consists of providing professional engineering services for the evaluation and recommendation of improvements for Park Ten #1, Northborough Drive #1, Northborough Drive # 2, Old Katy Road, Richmond #1 and Bonner Road Lift Stations.

 

LOCATION: 

 

Lift Station                        Address                                Key  Maps                   Council Districts

 

Park Ten No.1                            15350 Park Row                      448W                                  A

Northborough Drive No.1          12880 Northborough                372L                                   B

Northborough Drive No.2          13100 Northborough                372L                                   B

Old Katy Road                             12502 Old Katy                        488D                                  A

Richmond No.1                           10880 Richmond                      489Y                                   F

Bonner Road                               1516 1/2 Bonner                      492H                                   C

 

SCOPE OF CONTRACT AND FEE: Under the scope of the Contract, the Consultant will perform Phase I - Preliminary Design, Phase II - Final Design, Phase III - Construction Phase Services and Additional Services. Basic Services Fee for Phase I is based on cost of time and materials with not-to-exceed agreed upon amount. The Basic Services fees for Phase II and Phase III will be negotiated on a lump sum amount after the completion of Phase I. The total Basic Services appropriation is $1,222,611.00.

 

The Contract also includes certain Additional Services to be paid either as lump sum or on a reimbursable basis. The Additional Services include Site Topographical Survey, Geotechnical Investigations, Subsurface Investigations, Traffic Control Plans, Storm Water Pollution Prevention Plan, Reproduction Services, Technical Review Committee Presentation and Meetings, Existing Conditions Survey, Preparation of Designer’s Operation & Maintenance Manual, Independent Construction Cost Estimate, Public Meetings and Others. The total Additional Services appropriation is $258,833.00.

 

The negotiated maximum for Phase I Services is  $234,867.00.

 

The total cost of this project is $ 1,703,700.00 to be appropriated as follows: $ 1,481,444.00, for Contract services  and $ 222,256.00 for CIP Cost Recovery.

  

PAY OR PLAY PROGRAM: The proposed contract requires compliance with the City’s ‘Pay or Play’ ordinance regarding health benefits for employees of City contractors. In this case, the Contractor provides health benefits to eligible employees in compliance with City policy.

   

M/WBE PARTICIPATION: The M/WBE goal for the project is set at 24.00%. The Consultant has proposed the following firms to achieve this goal.

 

 

 

 

 

 

 

 

Name of Firms

Work Description

Amount

% of Total Contract

1

EJES Incorporated

Engineering Services

$137,715.00

9.30%

2

Gupta & Associates, Inc.

Electrical Services

$223,120.00

15.06%

3

HVJ Associates, Inc.

Geotechnical and Environmental Services

$51,209.50

3.46%

4

Landtech, Inc.DBA Landthech Consultants, Inc.

Surveying Services

$56,748.00

3.83%

 

 

Total

$468,792.50

31.64%

 

ESTIMATED FISCAL OPERATING IMPACT:

No significant Fiscal Operating impact is anticipated as a result of this project.

 

 

 

_____________________________________

Karun Sreerama, MBA, PhD, PE, Director

Department of Public Works and Engineering

 

WBS No. R-000267-0161-3

 

Prior Council Action:

N/A  


Amount of Funding:

$1,703,700.00 from Fund No.8500 Water and Sewer System Consolidated Construction Fund


Contact Information:

Ravi Kaleyatodi, P.E., CPM

  Senior Assistant Director, Engineering Branch

Phone: (832) 395-2326

ATTACHMENTS:
DescriptionType
Signed RCASigned Cover sheet
mapsBackup Material