Summary:

ORDINANCE appropriating $2,012,152.74 out of Water & Sewer System Consolidated Construction Fund, awarding contract to GRAVA, LLC for Waterline Rehab and Replacement Project; setting a deadline for the bidder’s execution of the contract and delivery of all bonds, insurance, and other required contract documents to the City; holding the bidder in default if it fails to meet the deadlines; providing funding for engineering and testing, and contingencies relating to construction of facilities financed by the Water & Sewer System Consolidated Construction Fund

Background:

SUBJECT: Contract Award for Waterline Rehab and Replacement Project.

 

RECOMMENDATION:  (Summary)

Accept low bid, award construction contract and appropriate funds.

 

PROJECT NOTICE/JUSTIFICATION: This project will provide for a work order based repair of water lines up to 16-inches in diameter in the distribution system on an emergency basis throughout the City.

 

DESCRIPTION/SCOPE: Work shall include the repair, improvement and/or new installation of main water lines and service lines.  The main lines range in diameter up to 16-inches and the water service lines range in size from ¾-inch to 2-inches in diameter.  The contract duration for this project is 365 calendar days.  This is a work order based contract with projects assigned on an as-needed basis.

 

LOCATION:   The project area is generally bounded by the City Limits.

 

BIDS:  Bids were received on December 8, 2016.  The six (6) bids are as follows:

 

           Bidder                                                   Bid Amount

 

1.  Grava, LLC                                                $1,849,669.28                        

2.  PM Construction & Rehab, LLC                $1,867,387.52 (Non–Responsive)   

3.  D. L. Elliott Enterprises, Inc.                      $1,973,696.96

4.  Nerie Construction, LLC                            $2,168,597.60       

5.  T. Construction, LLC                                  $2,204,034.08    

6.  Resicom, Inc.                                             $2,398,934.72

 

AWARD:  It is recommended that this construction contract be awarded to Grava LLC with a low bid of $1,849,669.28.

 

PROJECT COST:  The total cost of this project is $2,012,152.74 to be appropriated as follows: 

 

            Bid Amount                                            $1,849,669.28     

            Contingencies                                             $92,483.46    

            Engineering and Testing Services              $70,000.00       

 

Engineering and Testing Services will be provided by Tolunay-Wong Engineers, Inc. under a previously approved contract.

 

HIRE HOUSTON FIRST:  The proposed contract requires compliance with the City’s ‘Hire Houston First’ (HHF) ordinance that promotes economic opportunity for Houston businesses and supports job creation.  In this case, Grava LLC is a designated HHF company, but they were the successful awardee without application of the HHF preference.

 

PAY OR PLAY PROGRAM: The proposed contract requires compliance with the City’s ‘Pay or Play’ ordinance regarding health benefits for employees of City contractors.  In this case the contractor provides health benefits to eligible employees in compliance with City policy.

 

MW/SBE PARTICIPATION:  The low bidder has submitted the following proposed MW/SBE participation plan to satisfy the 12.0% MBE goal and 8.0% WBE goal for this project.

 

MBE-Name of Firm                   Work Description              Amount         % of Contract

 

D & D Underground Utilities    Utility Line Construction   $221,960.31            12.0%

 

                                         MBE TOTAL                             $221,960.31            12.0%

 

WBE-Name of Firm                 Work Description                Amount         % of Contract 

 

Barron Contractors                Utility Line Construction        $73,986.77               4.0% 

 

                                           WBE TOTAL                              $73,986.77              4.0%

 

SBE-Name of Firm                   Work Description                    Amount         % of Contract

 

Reyes Pineda

Construction, Inc.             Replacement of Water Lines

                                         Fire Hydrants and Water Taps   $73,986.77               4.0%   

 

                                          SBE TOTAL                              $73,986.77               4.0%

 

No Significant Fiscal Operating impact is anticipated as a result of this project.

 

 

 

 

____________________________________

Dale A. Rudick, P.E., Director

Department of Public Works and Engineering

 

WBS No. S-000035-0241-4

File No. WA 11255

 

Amount of Funding:

Amount and Source of Funding:   

                                                            

$2,012,152.74     Water and Sewer System Consolidated Construction Fund No. 8500.

Contact Information:

Yvonne Forrest

Senior Assistant Director, Drinking Water Operations

Public Utilities Division

(832) 395-2847